THPCH180 Equipment for Tunnel Installation of Main and Insertion LHC Cryo-magnets 3218
 
  • K. Artoos, S. Bartolome-Jimenez, O. Capatina, T. Feniet, J.L. Grenard, M. Guinchard, K. Kershaw
    CERN, Geneva
 
  The installation of about 1700 superconducting dipoles and quadrupoles in the Large Hadron Collider (LHC) is now well underway. The transport and installation of the LHC cryo-magnets in the LEP tunnels originally designed for smaller, lighter LEP magnets have required development of completely new handling solutions. The severe space constraints combined with the long, heavy loads have meant that solutions had to be very sophisticated. The paper describes the procedure of the installation of the main cryo-magnets in the arc as well as the more specific insertion cryo-magnets. The logistics for the handling and transport are monitored with tri-axial acceleration monitoring devices that are installed on each cryo-magnet to ensure their mechanical and geometric integrity. These dynamic results are commented. The paper includes conclusions and some lessons learned.