MOBI02 |
Status of SPES Cyclotron at Laboratori Nazionali of Legnaro |
26 |
|
- M. Maggiore, P. Antonini, L. Pranovi, A. Ruzzon
INFN/LNL, Legnaro (PD), Italy
|
|
|
The SPES cyclotron at Laboratori Nazionali di Legnaro was installed and commissioned on 2017 and the accelerator was operational until March 2021. The shut down was foreseen in order to permit the completion of the SPES facility, while the resume of activities is expected on 2023. The status of the SPES cyclotron and related high intensity beamlines will be presented as well as the last performance achieved in terms of accelerated current up to 1 MeV. Moreover the program of upgrade of the ancillary systems shall be discussed.
|
|
|
Slides MOBI02 [15.756 MB]
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-CYCLOTRONS2022-MOBI02
|
|
About • |
Received ※ 29 December 2022 — Revised ※ 12 January 2023 — Accepted ※ 31 January 2023 — Issue date ※ 12 February 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|