Author: Pashchenko, S.V.
Paper Title Page
THA03 Development of FLNR JINR Heavy Ions Accelerator Complex (DRIBs III) 278
 
  • B. Gikal, S.L. Bogomolov, S.N. Dmitriev, G.G. Gulbekyan, I.A. Ivanenko, I.V. Kalagin, N.Yu. Kazarinov, Y.T. Oganessian, N.F. Osipov, S.V. Pashchenko
    JINR, Dubna, Moscow Region, Russia
 
  The cyclotrons of U-400, U-400M, and IC-100 are in operation in the Flerov Laboratory of Nuclear Reactions for implementation of scientific program and applied research. Total operation time of these accelerators is about 15000 hours per year. One of the basic scientific programs in FLNR is the synthesis of new elements that demands intensive beams of heavy ions. Now U-400 is capable to provide long-term experiments on 48Ca beam with intensity of 1 pμA. The high-intensity DC-280 cyclotron has been developed in FLNR in order to increase the 48Ca beam intensity up to 10 pμA for this task. The cyclotron U-400 has been in operation since 1978. The U-400 modernization into U-400R is planned to start after finishing DC-280 project. At the U-400M cyclotron, we plan to increase the ion energy of the extracted beam, which now is limited by 55 MeV/nucleon. The IC-100 is used in the laboratory as a specialized machine for applied research on the heavy ion beams with energies of 1 - 1.2 MeV/nucleon.  
slides icon Slides THA03 [25.206 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)