Keyword: operation
Paper Title Other Keywords Page
MOPF08 Secondary Electron Measurements at the HIM Electron Cooler Test Set-Up electron, simulation, dipole, optics 48
 
  • M.W. Bruker, K. Aulenbacher, J. Dietrich, A. Hofmann, T. Weilbach
    HIM, Mainz, Germany
 
  The planned advances in electron cooling technology aimed at improving the operation of future hadron storage rings include an increase in electron beam current and acceleration voltage. A test set-up has been built at Helmholtz-Insitut Mainz (HIM) to optimize the recuperation efficiency of such high-current beams in energy recovery operation, requiring a thorough understanding of their interaction with external electric and magnetic fields, such as those found in a Wien velocity filter. Beam diagnostics are carried out using a BPM and current-sensing scraper electrodes. At present, the set-up can be successfully operated at U=17 kV, I=600 mA, showing a relative secondary electron current of about 2·10-4. We present the current state of the project and its objectives for the foreseeable future.  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)