Paper |
Title |
Page |
TUPB104 |
Series Production of BQU at DESY for the EU-XFEL Module Assembly at CEA Saclay |
865 |
|
- B. van der Horst, M. Helmig, A. Matheisen, S. Saegebarth, M. Schalwat
DESY, Hamburg, Germany
|
|
|
Each of the 103 XFEL modules foreseen for the EU-XFEL as well as the 3,9 GHZ injector module is equipped with a combination of beam position monitors, superconducting quadrupole and a gate valve connected to the beam position monitor. The subunits are prequalified by the different work package of the EU-XFEL collaboration and handover to the DESY cleanroom. These subunits are assembled in the DESY ISO 4 cleanroom to unit named BQU, quality controlled in respect of cleanliness and handover in status “ready for assembly in ISO 4 cleanroom” for string assembly to the ISO 4 cleanroom located at CEA France. Series production started with production sequences of one unit per week and needed to be accelerated up to five or six units per month (>=1.25 units per week) in beginning of 2015. Analysis of data taken during production and the optimization of work flow for higher production rates are presented.
|
|
Export • |
reference for this paper to
※ BibTeX,
※ LaTeX,
※ Text,
※ RIS/RefMan,
※ EndNote (xml)
|
|
|