Author: Deschamps, J-B.
Paper Title Page
TUPB106 First HIE-ISOLDE Cryo-module Assembly at CERN 874
 
  • M. Therasse, G. Barlow, S. Bizzaglia, J.A. Bousquet, A. Chrul, P. Demarest, J-B. Deschamps, J.A. Ferreira Somoza, J. Gayde, M. Gourragne, A. Harrison, G. Kautzmann, D. Mergelkuhl, V. Parma, M. Struik, W. Venturini Delsolaro, L.R. Williams, P. Zhang
    CERN, Geneva, Switzerland
  • J. Dequaire
    Intitek, Lyon, France
 
  The first phase of the HIE-ISOLDE project aims to increase the energy of the existing REX ISOLDE facilities from 3MeV/m to 5MeV/m. It involves the assembly of two superconducting cryo-modules based on quarter wave resonators made by niobium sputtered on copper. The first cryo-module was installed in the linac in May 2015 followed by the commissioning. The first beam is expected for September 2015. In parallel the second cryo-module assembly started. In this paper, we present the different aspects of these two cryo-modules including the assembly facilities and procedures, the quality assurance and the RF parameters (cavity performances, cavity tuning and coupling).  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)