Paper |
Title |
Page |
MOPB076 |
Horizontal RF Test of a Fully Equipped 3.9 GHz Cavity for the European XFEL in the DESY AMTF |
301 |
|
- C.G. Maiano, C. Albrecht, R. Bospflug, J. Branlard, Ł. Butkowski, T. Delfs, J. Eschke, A. Gössel, F. Hoffmann, M. Hüning, K. Jensch, R. Jonas, R. Klos, D. Kostin, W. Maschmann, A. Matheisen, U. Mavrič, W.-D. Möller, C. Müller, K. Mueller, B. Petersen, P. Pierini, J. Rothenburg, O. Sawlanski, M. Schmökel, A.A. Sulimov, E. Vogel
DESY, Hamburg, Germany
- A. Bosotti, M. Moretti, R. Paparella, P. Pierini, D. Sertore
INFN/LASA, Segrate (MI), Italy
- E.R. Harms
Fermilab, Batavia, Illinois, USA
- C.R. Montiel
ANL, Argonne, Illinois, USA
- S. Pivovarov
BINP SB RAS, Novosibirsk, Russia
|
|
|
In order to validate the cavity package concept before the module preparation for the European XFEL Injector, one 3.9 GHz cavity, complete with magnetic shielding, power coupler and frequency tuner was tested in a specially designed single cavity cryomodule in one of the caves of the DESY Accelerator Module Test Facility (AMTF). The cavity was tested in high power pulsed operation up to the quench limit of 24 MV/m, above the vertical test qualifications and all subsystems under test (coupler, tuner, waveguide tuners, LLRF system) were qualified to design performances.
|
|
Export • |
reference for this paper to
※ BibTeX,
※ LaTeX,
※ Text,
※ RIS/RefMan,
※ EndNote (xml)
|
|
|
TUPB018 |
Preparation of the 3.9 GHz System for the European XFEL Injector Commissioning |
584 |
|
- P. Pierini, M. Bertucci, M. Bonezzi, A. Bosotti, J.F. Chen, M. Chiodini, P. Michelato, L. Monaco, M. Moretti, R. Paparella, D. Sertore
INFN/LASA, Segrate (MI), Italy
- C. Albrecht, N. Baboi, S. Barbanotti, J. Branlard, Th. Buettner, Ł. Butkowski, T. Delfs, H. Hintz, F. Hoffmann, M. Hüning, K. Jensch, R. Jonas, R. Klos, D. Kostin, L. Lilje, C.G. Maiano, W. Maschmann, A. Matheisen, U. Mavrič, W.-D. Möller, C. Müller, P. Pierini, J. Prenting, J. Rothenburg, O. Sawlanski, M. Schlösser, M. Schmökel, A.A. Sulimov, E. Vogel
DESY, Hamburg, Germany
- E.R. Harms
Fermilab, Batavia, Illinois, USA
- C.R. Montiel
ANL, Argonne, Illinois, USA
- C. Pagani
Università degli Studi di Milano & INFN, Segrate, Italy
|
|
|
The 3.9 GHz cryomodule and RF system for the XFEL Injector is being assembled and delivered to the underground building in summer 2015, for the injector commissioning in Fall 2015. This contribution outlines the status of the activity and reports the preparation stages of the technical commissioning of the system.
|
|