Paper | Title | Page |
---|---|---|
MOPO013 | RF Test Results from Cryomodule 1 at the Fermilab SRF Beam Test Facility | 79 |
|
||
Funding: Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy. Powered operation of Cryomodule 1 (CM-1) at the Fermilab SRF Beam Test Facility began in late 2010. Since then a series of tests first on the eight individual cavities and then the full cryomodule have been performed. We report on the results of these tests and lessons learned which will have an impact on future module testing at Fermilab. |
||
![]() |
Poster MOPO013 [3.894 MB] | |
TUPO055 | Horizontal SRF Cavity Testing at Fermilab | 522 |
|
||
Funding: U.S. Department of Energy, Contract No. DE-AC02-07CH11359 Fermilab makes use of a single-cavity test cryostat to assess the performance of dressed superconducting RF cavities using pulsed high-power RF before they are assembled into a cryomodule. Cavity performance is evaluated in terms of accelerating gradient, unloaded quality factor, and field emission. The functionality of auxiliary components such as tuners and fundamental power couplers is also verified. The latest results from extensive testing of nine-cell 1.3 GHz cavities are presented here, along with a discussion of future extensions of the horizontal test program to include 650 MHz cavities and continuous wave testing. |
||
![]() |
Poster TUPO055 [0.314 MB] | |
WEIOA05 | X-Ray Tomography Inspection of SRF Cavities | 588 |
|
||
Funding: Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy. Performance issues with superconducting cavities and a desire for an enhanced non-invasive view of the interior of a cavity compared to that provided by optical means has led us to inspection using 3-dimensional X-ray tomography. This technique has provided the necessary view of suspected faults in Higher Order Mode couplers. This success naturally leads to determining if x-ray inspection of welds and other potential cavity defects might prove to be helpful during cavity fabrication. Results of x-ray scans from commercial vendors and potential for this technique will be presented. |
||
![]() |
Slides WEIOA05 [0.910 MB] | |
THPO037 | Lorentz Force Detuning Compensation in Fermilab Cryomodule 1 | 801 |
|
||
Cryomodule 1 of the Fermilab SRF Accelerator Test Facility has recently been commissioned. First results are presented from the simultaneous compensation of Lorentz force detuning in all eight of the 1.3 GHz Tesla style superconducting cavities. | ||
![]() |
Poster THPO037 [0.958 MB] | |