Paper | Title | Page |
---|---|---|
TUP077 | Vibrational Measurements for Commissioning SRF Accelerator Test Facility at Fermilab | 967 |
|
||
Funding: Operated by Fermi Research Alliance, LLC, under Contract No. DE-AC02- 07CH11359 with the U.S. Department of Energy. The commissioning of two cryomodule components is underway at Fermilab’s Superconducting Radio Frequency (SRF) Accelerator Test Facility. The research at this facility supports the next generation high intensity linear accelerators such as the International Linear Collider (ILC), a new high intensity injector (Project X) and other future machines. These components, Cryomodule #1 (CM1) and Capture Cavity II (CC2) which contain 1.3 GHz cavities are connected in series in the beamline and through cryogenic plumbing. Studies regarding characterization of ground motion, technical and cultural noise continue. Mechanical transfer functions between the foundation and critical beamline components have been measured and overall system displacement characterized. Baseline motion measurements given initial operation of cryogenic, vacuum systems and other utilities are considered. |
||
TUP080 | Tests of a Tuner for a 325 MHz SRF Spoke Resonator | 973 |
|
||
Funding: Work is supported by the U.S. Department of Energy Fermilab is developing 325 MHz SRF spoke cavities for the proposed ProjectX. A compact fast/slow tuner has been developed to compensate microphonics and Lorentz force detuning. The modified tuner design and results of 4K tests of the first prototype are presented. |
||
TUP082 | Test of a Coaxial Blade Tuner at HTS/FNAL | 976 |
|
||
Funding: Work is supported by the U.S. Department of Energy Fermilab is building Cryomodule 2 for ILCTA facility at NML. A coaxial blade tuner has been chosen for the CM2 1.3GHz SRF cavities. A summary of results from cold test of the tuners in the Fermilab Horizontal Test Stand will be presented. |
||
THOCS5 | Resonance Control in SRF Cavities at FNAL | 2130 |
|
||
Funding: Work is supported by the U.S. Department of Energy An adaptive Least Squares algorithm to control Lorentz force detuning in SRF cavities has been developed and tested in the HTS at FNAL. During open-loop tests in the FNAL HTS, the algorithm was able to reduce LFD in a 9-cell 1.3 GHz elliptical cavity operating at 35 MV/m from 600 Hz to less than 10 Hz during both the fill and the flattop. The algorithm was also able to adapt to changes in the gradient of the cavity and to changes in the pulse length. |
||
![]() |
Slides THOCS5 [3.572 MB] | |
TUP076 | First High Power Pulsed Tests of a Dressed 325 MHz Superconducting Single Spoke Resonator at Fermilab | 964 |
|
||
In the recently commissioned superconducting RF cavity test facility at Fermilab (SCTF), a 325 MHz, β=0.22 superconducting single-spoke resonator (SSR1) has been tested for the first time with its input power coupler. Previously, this cavity had been tested CW with a low power, high Qext test coupler; first as a bare cavity in the Fermilab Vertical Test Stand and then fully dressed in the SCTF. For the tests described here, the design input coupler with Qext ~ 106 was used. Pulsed power was provided by a Toshiba E3740A 2.5 MW klystron. | ||
TUP086 | Microphonics control for Project X | 988 |
|
||
Funding: Work is supported by the U.S. Department of Energy The proposed multi-MW Project X facility at Fermilab will employ cavities with bandwidths as narrow as 20 Hz. This combination of high RF power with narrow bandwidths combined requires careful attention to detuning control if these cavities are to be operated successfully. Detuning control for Projects X will require a coordinated effort between the groups responsible for various machine subsystems. Considerable progress in this area has been made over the past year. |
||
FROBS5 | 1.3 GHz Superconducting RF Cavity Program at Fermilab | 2586 |
|
||
Funding: Work supported by Fermi Research Alliance, LLC under contract DE-AC02-07CH11359 with the U.S. Department of Energy. At Fermilab, 9-cell 1.3 GHz superconducting RF (SRF) cavities are prepared, qualified, and assembled into cryomodules, for Project X, an International Linear Collider, or other future projects. The 1.3 GHz SRF cavity program includes targeted R&D on 1-cell 1.3 GHz cavities for cavity performance improvement. Production cavity qualification includes cavity inspection, surface processing, clean assembly, and one or more cryogenic low-power CW qualification tests which typically include performance diagnostics. Qualified cavities are welded into helium vessels and are cryogenically tested with pulsed high-power. Well performing cavities are assembled into cryomodules for pulsed high-power testing in a cryomodule test facility, and possible installation into a beamline. The overall goals of the 1.3 GHz SRF cavity program, supporting facilities, and accomplishments are described. |
||
![]() |
Slides FROBS5 [3.749 MB] | |