Author: Parker, B.
Paper Title Page
MOP276 Applying Cascaded Parameter Scan to Study Top-off Safety in NSLS-II Storage Ring 627
 
  • Y. Li, S.V. Badea, W.R. Casey, G. Ganetis, R. Heese, H.-C. Hseuh, P.K. Job, S. Krinsky, B. Parker, T.V. Shaftan, S.K. Sharma, L. Yang
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by U.S. DOE, Contract No. DE-AC02-98CH10886
In this paper we introduce a new algorithm, the cascaded parameter scan method, to efficiently carry out the scan over magnet parameters in the safety analysis for the NSLS-II top-off injection. In top-off safety analysis, one must track particles populating phase space through a beamline containing magnets and apertures and clearly demonstrate that for all possible magnet settings and errors, all particles are lost on scrapers within the properly shielded region. In the usual approach, the number of tracking runs increases exponentially with the number of magnet settings. In the cascaded parameter scan method, the number of tracking runs only increases linearly. This reduction of exponential to linear dependence on the number of setpoints, greatly reduces the required computation time and allows one to more densely populate phase space and to increase the number of setpoints scanned for each magnet. An example of applying this approach to analyze an NSLS-II beamline, the damping wiggler beamline, is also given.
 
 
THP131 Injection Straight Pulsed Magnet Error Tolerance Study for Top-off Injection 2366
 
  • G.M. Wang, R.P. Fliller, R. Heese, S. Kowalski, B. Parker, T.V. Shaftan, F.J. Willeke
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by U.S. DOE, Contract No.DE-AC02-98CH10886
NSLS II is designed to work in top-off injection mode. The goal is to minimize the disturbance of the injection transient on the users. The injection straight includes a septum and four fast kicker magnets. The pulsed magnet errors will excite a betatron oscillation. This paper gives the formulas of each error contribution to the oscillation amplitude at various source points in the ring. These are compared with simulation results. Based on the simple formulas, we can specify the error tolerances on the pulsed magnets and scale it to similar machines.
 
 
THP135 Implementation of a DC Bump at the Storage Ring Injection Straight Section 2378
 
  • G.M. Wang, R.P. Fliller, W. Guo, R. Heese, S.L. Kramer, B. Parker, T.V. Shaftan, C.J. Spataro, F.J. Willeke, L.-H. Yu
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by U.S. DOE, Contract No.DE-AC02-98CH10886
The NSLS II beam injection works with two septa and four fast kicker magnets. The kicker power supplies each produce a two revolution periods pulsed field, 5.2μs half sine waveform, using ~5kV drive voltage. The corresponding close orbit bump amplitude is ~15mm. It is desired that the bump they produce is transparent to the users for top-off injection. However, high voltage and short pulse power supplies have challenges to maintain pulse-to-pulse stability and magnet-to-magnet reproducibility. To minimize these issues, we propose to implement a DC local bump on top of the fast bump to reduce the fast kicker strength by a factor of 2/3. This bump uses two ring corrector magnets plus one additional magnet at the septum to create a bump. Additionally, these magnets could provide a DC bump, which would simulate the effects of a movable septum on the store beam lifetime. This paper presents the detail design of this DC injection bump and related beam dynamics.
 
 
TUOAN2 High Luminosity Electron-Hadron Collider eRHIC 693
 
  • V. Ptitsyn, E.C. Aschenauer, M. Bai, J. Beebe-Wang, S.A. Belomestnykh, I. Ben-Zvi, M. Blaskiewicz, R. Calaga, X. Chang, A.V. Fedotov, H. Hahn, L.R. Hammons, Y. Hao, P. He, W.A. Jackson, A.K. Jain, E.C. Johnson, D. Kayran, J. Kewisch, V. Litvinenko, G.J. Mahler, G.T. McIntyre, W. Meng, M.G. Minty, B. Parker, A.I. Pikin, T. Rao, T. Roser, B. Sheehy, J. Skaritka, S. Tepikian, R. Than, D. Trbojevic, N. Tsoupas, J.E. Tuozzolo, G. Wang, Q. Wu, W. Xu, A. Zelenski
    BNL, Upton, Long Island, New York, USA
  • E. Pozdeyev
    FRIB, East Lansing, Michigan, USA
  • E. Tsentalovich
    MIT, Middleton, Massachusetts, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
We present the design of future high-energy high-luminosity electron-hadron collider at RHIC called eRHIC. We plan on adding 20 (potentially 30) GeV energy recovery linacs to accelerate and to collide polarized and unpolarized electrons with hadrons in RHIC. The center-of-mass energy of eRHIC will range from 30 to 200 GeV. The luminosity exceeding 1034 cm-2 s-1 can be achieved in eRHIC using the low-beta interaction region with a 10 mrad crab crossing. We report on the progress of important eRHIC R&D such as the high-current polarized electron source, the coherent electron cooling and the compact magnets for recirculating passes. A natural staging scenario of step-by-step increases of the electron beam energy by builiding-up of eRHIC's SRF linacs and a potential of adding polarized positrons are also presented.
 
slides icon Slides TUOAN2 [4.244 MB]  
 
THP216 Progress with NSLS-II Injection Straight Section Design 2528
 
  • T.V. Shaftan, A. Blednykh, W.R. Casey, L.R. Dalesio, R. Faussete, M.J. Ferreira, R.P. Fliller, G. Ganetis, R. Heese, H.-C. Hseuh, P.K. Job, E.D. Johnson, B.N. Kosciuk, S. Kowalski, S.L. Kramer, D. Padrazo, B. Parker, I. Pinayev, S.K. Sharma, O. Singh, C.J. Spataro, G.M. Wang, F.J. Willeke
    BNL, Upton, Long Island, New York, USA
 
  Funding: This work is supported by U.S. DOE, Contract No.DE-AC02-98CH10886
NSLS-II injection straight section consists of the pulsed and DC/Slow bumps, septa system, beam trajectory correction and diagnostics systems. In this paper we discuss overall injection straight layout, preliminary element designs, specifications for the pulsed and DC magnets and their power supplies, vacuum devices and chambers and diagnostics devices.