Author: Minty, M.G.
Paper Title Page
MOOCN3 RHIC Polarized Proton Operation 41
 
  • H. Huang, L. A. Ahrens, I.G. Alekseev, E.C. Aschenauer, G. Atoian, M. Bai, A. Bazilevsky, J. Beebe-Wang, M. Blaskiewicz, J.M. Brennan, K.A. Brown, D. Bruno, R. Connolly, T. D'Ottavio, A. Dion, K.A. Drees, W. Fischer, C.J. Gardner, J.W. Glenn, X. Gu, M. Harvey, T. Hayes, L.T. Hoff, R.L. Hulsart, J.S. Laster, C. Liu, Y. Luo, W.W. MacKay, Y. Makdisi, M. Mapes, G.J. Marr, A. Marusic, F. Méot, K. Mernick, R.J. Michnoff, M.G. Minty, C. Montag, J. Morris, S. Nemesure, A. Poblaguev, V. Ptitsyn, V.H. Ranjbar, G. Robert-Demolaize, T. Roser, W.B. Schmidke, V. Schoefer, F. Severino, D. Smirnov, K.S. Smith, D. Steski, D. Svirida, S. Tepikian, D. Trbojevic, N. Tsoupas, J.E. Tuozzolo, G. Wang, M. Wilinski, K. Yip, A. Zaltsman, A. Zelenski, K. Zeno, S.Y. Zhang
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
RHIC operation as the polarized proton collider presents unique challenges since both luminosity and spin polarization are important. With longitudinally polarized beams at the experiments, the figure of merit is LP4. A lot of upgrades and modifications have been made since last polarized proton operation. A 9 MHz rf system has been installed to improve longitudinal match at injection and to increase luminosity. The beam dumps were upgraded to allow for increased bunch intensities. A vertical survey of RHIC was performed before the run to get better magnet alignment. The orbit control has also been improved this year. Additional efforts were put in to improve source polarization and AGS polarization transfer efficiency. To preserve polarization on the ramp, a new working point was chosen such that the vertical tune is near a third order resonance. The overview of the changes and the operation results are presented in this paper.
 
slides icon Slides MOOCN3 [2.331 MB]  
 
MOP194 A Laser-Wire Beam-Energy and Beam-Profile Monitor at the BNL Linac 456
 
  • R. Connolly, L. DeSanto, C. Degen, R.J. Michnoff, M.G. Minty, D. Raparia
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work performed under Contract #DE-AC02-98CH10886 under the auspices of the US Department of Energy.
In 2009 a beam-energy monitor was installed in the high energy beam transport (HEBT) line at the Brookhaven National Lab linac. This device measures the energies of electrons stripped from the 40mA H beam by background gas. Electrons are stripped by the 1.7x10-7torr residual gas at a rate of ~2.4x10-8/cm. Since beam electrons have the same velocities as beam protons, the beam proton energy is deduced by multiplying the electron energy by mp/me=1836. A 183.6MeV H beam produces 100keV electrons. In 2010 we installed an optics plates containing a laser and optics to add beam-profile measurement capability via photodetachment. Our 100mJ/pulse, Q-switched laser neutralizes 70% of the beam during its 10ns pulse. The chamber in which the laser light passes through the ion beam is upstream of a dipole magnet which deflects the electrons into a biased retarding-grid (V<125kV) Faraday-cup detector. To measure beam profiles, a narrow laser beam is stepped across the ion beam removing electrons from the portion of the H beam intercepted by the laser. The laser also gives us energy measurements on the 0.2mA polarized proton beam.
 
 
MOP203 RHIC Spin Flipper AC Dipole Controller 474
 
  • P. Oddo, M. Bai, W.C. Dawson, D.M. Gassner, M. Harvey, T. Hayes, K. Mernick, M.G. Minty, T. Roser, F. Severino, K.S. Smith
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under contract DE-AC02-98CH10886 with the U.S. Department of Energy and RIKEN, Japan.
The RHIC Spin Flipper's five high-Q AC dipoles which are driven by a swept frequency waveform require precise control of phase and amplitude during the sweep. This control is achieved using FPGA based feedback controllers. Multiple feedback loops are used to control and dynamically tune the magnets. The current implementation and results will be presented.
 
 
MOP208 Baseline Suppression Problems for High Precision Measurements Using Optical Beam Profile Monitors. 486
 
  • P. Thieberger, D.M. Gassner, J.W. Glenn, M.G. Minty, C.M. Zimmer
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
The use of fluorescent screens for beam profile monitors provides a simple and widely used way to obtain detailed two dimensional intensity maps. For high precision measurements many possible error contributions need to be considered that have to do with properties of the fluorescent screens and of the CCDs. Saturation effects, reflections within and outside the screen, non-linearities, radiation damage, etc are often mentioned. Here we concentrate on an error source less commonly described, namely erroneous baseline subtraction, which is particularly important when fitting projected images. We show computer simulations as well as measurement results having remarkable sensitivity of the fitted profile widths to even partial suppression of the profile baseline data, which often arises from large pixel-to-pixel variations at low intensity levels. Such inadvertent baseline data suppression is very easy to miss as it is usually not obvious when inspecting projected profiles. In this report we illustrate this effect and discuss possible algorithms to automate the detection of this problem as well as some possible corrective measures.
 
 
MOP209 Proposed Scattered Electron Detector System as One of the Beam Overlap Diagnostic Tools for the New RHIC Electron Lens 489
 
  • P. Thieberger, E.N. Beebe, C. Chasman, W. Fischer, D.M. Gassner, X. Gu, R.C. Gupta, J. Hock, R.F. Lambiase, Y. Luo, M.G. Minty, C. Montag, M. Okamura, A.I. Pikin, Y. Tan, J.E. Tuozzolo, W. Zhang
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
An electron lens for head-on beam-beam compensation planned for RHIC requires precise overlap of the electron and proton beams which both can have down to 0.3 mm rms transverse radial widths along the 2m long interaction region. Here we describe a new diagnostic tool that is being considered to aid in the tuning and verification of this overlap. Some of ultra relativistic protons (100 or 250 GeV) colliding with low energy electrons (2 to 10 keV) will transfer sufficient transverse momentum to cause the electrons to spiral around the magnetic guiding field in a way that will make them detectable outside of the main solenoid. Time-of-flight of the halo electron signals will provide position-sensitive information along the overlap region. Scattering cross sections are calculated and counting rate estimates are presented as function of electron energy and detector position.
 
 
MOP267 Fast BPM Data Distribution for Global Orbit Feedback Using Commercial Gigabit Ethernet Technology 606
 
  • R.L. Hulsart, P. Cerniglia, R.J. Michnoff, M.G. Minty
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
In order to correct beam perturbations in RHIC around 10Hz, a new fast data distribution network was required to deliver BPM position data at rates several orders of magnitude above the capability of the existing system. The urgency of the project limited the amount of custom hardware that could be developed, which dictated the use of as much commercially available equipment as possible. The selected architecture uses a custom hardware interface to the existing RHIC BPM electronics together with commercially available Gigabit Ethernet switches to distribute position data to devices located around the collider ring. Using the minimum Ethernet packet size and a field programmable gate array (FPGA) based state machine logic instead of a software based driver, real-time and deterministic data delivery is possible using Ethernet. The method of adapting this protocol for low latency data delivery, bench testing of Ethernet hardware, and the logic to construct Ethernet packets using FPGA hardware will be discussed.
 
 
TUP288 A Very Thin Havar Film Vacuum Window for Heavy Ions to Perform Radiobiology Studies at the BNL Tandem 1367
 
  • P. Thieberger, H. Abendroth, J.G. Alessi, L. Cannizzo, C. Carlson, A. Gustavsson, M.G. Minty, L. Snydstrup
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
Heavy ion beams from one of the BNL Tandem Van de Graaff accelerators will be made available for radiobiology studies on cell cultures. Energy losses need to be minimized both in the vacuum window and in the air in order to achieve the ranges required for the cells to be studied. This is particularly challenging for ions heavier than iron. The design is presented of a 0.4” diameter Havar film window that will satisfy these requirements. Films as thin as 80μinches were successfully pressure tested. The final thickness to be used may be slightly larger to help in achieving pin hole free windows. We discuss design considerations and present pressure and vacuum test results as well as tests with heavy ion beams.
 
 
WEOBN1 Simultaneous Orbit, Tune, Coupling, and Chromaticity Feedback at RHIC 1394
 
  • M.G. Minty, A.J. Curcio, W.C. Dawson, C. Degen, R.L. Hulsart, Y. Luo, G.J. Marr, A. Marusic, K. Mernick, R.J. Michnoff, P. Oddo, V. Ptitsyn, G. Robert-Demolaize, T. Russo, V. Schoefer, C. Schultheiss, S. Tepikian, M. Wilinski
    BNL, Upton, Long Island, New York, USA
  • T. Satogata
    JLAB, Newport News, Virginia, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
All physics stores at the Relativistic Heavy Ion Collider are now established using simultaneous orbit, tune, coupling, and energy feedback during beam injection, acceleration to full beam energies, during the “beta-squeeze” for establishing small beam sizes at the interaction points, and during removal of separation bumps to establish collisions. In this report we describe the major changes made to enable these achievements. The proof-of-principle for additional chromaticity feedback will also be presented.
 
slides icon Slides WEOBN1 [8.054 MB]  
 
THP056 Near Real-time ORM Measurements and SVD Matrix Generation for 10 Hz Global Orbit Feedback In RHIC 2226
 
  • C. Liu, R.L. Hulsart, W.W. MacKay, A. Marusic, K. Mernick, R.J. Michnoff, M.G. Minty
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
To reduce the effect of trajectory perturbations due to vibrations of the final focusing quadrupoles at RHIC, global orbit feedback was successfully prototyped during run-10. The system was tested using transfer functions between the beam position monitors and correctors obtained from the online optical model and a correction algorithm based on singular value decomposition (SVD). In run-11 we plan to self-calibrate the system using SVD matrices derived from orbit response matrix (ORM) measurements acquired real-time using the new FPGA-based signal processing. Comparisons between measurement and model and of feedback performance with the two methods are presented.
 
 
THP065 Advances in High-Order Interaction Region Nonlinear Optics Correction at RHIC 2252
 
  • C.M. Zimmer, S. Binello, M.G. Minty, F.C. Pilat
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
A method to indirectly measure and deterministically correct the higher order magnetic errors of the final focusing magnets in the Relativistic Heavy Ion Collider has been in place for several years at BNL. This method yields control over the effects of multi-pole errors through application of closed orbit bumps followed by analysis and correction of the resulting betatron tune shifts using multi-pole correctors. The process has recently been automated in order to provide more efficient and effective corrections. The tune resolution along with the reliability of tune measurements has also been improved significantly due to advances/upgrades in the betatron tune measurement system employed at RHIC (BBQ). Here we describe the foundation of the IR bump method, followed by recent improvements along with experimental data.
 
 
MOP268 RHIC 10 Hz Global Orbit Feedback System 609
 
  • R.J. Michnoff, L. Arnold, C. Carboni, P. Cerniglia, A.J. Curcio, L. DeSanto, C. Folz, C. Ho, L.T. Hoff, R.L. Hulsart, R. Karl, C. Liu, Y. Luo, W.W. MacKay, G.J. Mahler, W. Meng, K. Mernick, M.G. Minty, C. Montag, R.H. Olsen, J. Piacentino, P. Popken, R. Przybylinski, V. Ptitsyn, J. Ritter, R.F. Schoenfeld, P. Thieberger, J.E. Tuozzolo, A. Weston, J. White, P. Ziminski, P. Zimmerman
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
Vibrations of the cryogenic triplet magnets at the Relativistic Heavy Ion Collider (RHIC) are suspected to be causing the beam perturbations observed at frequencies around 10 Hz. Several solutions to counteract the effect have been considered in the past, including reinforcing the magnet base support assembly, a mechanical servo feedback system, and a local beam feedback system at each of the two experimental areas. However, implementation of the mechanical solutions would be expensive, and the local feedback system was insufficient since perturbation amplitudes outside the experimental areas were still problematic. A global 10 Hz orbit feedback system is currently under development at RHIC consisting of 36 beam position monitors (BPMs) and 12 small dedicated dipole corrector magnets in each of the two counter-rotating rings. A subset of the system consisting of 8 BPMs and 4 corrector magnets in each ring was installed and successfully tested during the RHIC 2010 run; and the complete system is being installed for the 2011 run. A description of the overall system architecture and results with beam will be discussed.
 
 
TUOAN2 High Luminosity Electron-Hadron Collider eRHIC 693
 
  • V. Ptitsyn, E.C. Aschenauer, M. Bai, J. Beebe-Wang, S.A. Belomestnykh, I. Ben-Zvi, M. Blaskiewicz, R. Calaga, X. Chang, A.V. Fedotov, H. Hahn, L.R. Hammons, Y. Hao, P. He, W.A. Jackson, A.K. Jain, E.C. Johnson, D. Kayran, J. Kewisch, V. Litvinenko, G.J. Mahler, G.T. McIntyre, W. Meng, M.G. Minty, B. Parker, A.I. Pikin, T. Rao, T. Roser, B. Sheehy, J. Skaritka, S. Tepikian, R. Than, D. Trbojevic, N. Tsoupas, J.E. Tuozzolo, G. Wang, Q. Wu, W. Xu, A. Zelenski
    BNL, Upton, Long Island, New York, USA
  • E. Pozdeyev
    FRIB, East Lansing, Michigan, USA
  • E. Tsentalovich
    MIT, Middleton, Massachusetts, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
We present the design of future high-energy high-luminosity electron-hadron collider at RHIC called eRHIC. We plan on adding 20 (potentially 30) GeV energy recovery linacs to accelerate and to collide polarized and unpolarized electrons with hadrons in RHIC. The center-of-mass energy of eRHIC will range from 30 to 200 GeV. The luminosity exceeding 1034 cm-2 s-1 can be achieved in eRHIC using the low-beta interaction region with a 10 mrad crab crossing. We report on the progress of important eRHIC R&D such as the high-current polarized electron source, the coherent electron cooling and the compact magnets for recirculating passes. A natural staging scenario of step-by-step increases of the electron beam energy by builiding-up of eRHIC's SRF linacs and a potential of adding polarized positrons are also presented.
 
slides icon Slides TUOAN2 [4.244 MB]  
 
THP054 Medium Energy Heavy Ion Operations at RHIC 2220
 
  • K.A. Drees, L. A. Ahrens, M. Bai, J. Beebe-Wang, I. Blackler, M. Blaskiewicz, J.M. Brennan, K.A. Brown, D. Bruno, J.J. Butler, C. Carlson, R. Connolly, T. D'Ottavio, W. Fischer, W. Fu, D.M. Gassner, M. Harvey, T. Hayes, H. Huang, R.L. Hulsart, P.F. Ingrassia, N.A. Kling, M. Lafky, J.S. Laster, R.C. Lee, V. Litvinenko, Y. Luo, W.W. MacKay, M. Mapes, G.J. Marr, A. Marusic, K. Mernick, R.J. Michnoff, M.G. Minty, C. Montag, J. Morris, C. Naylor, S. Nemesure, F.C. Pilat, V. Ptitsyn, G. Robert-Demolaize, T. Roser, P. Sampson, T. Satogata, V. Schoefer, C. Schultheiss, F. Severino, T.C. Shrey, K.S. Smith, S. Tepikian, P. Thieberger, D. Trbojevic, N. Tsoupas, J.E. Tuozzolo, M. Wilinski, A. Zaltsman, K. Zeno, S.Y. Zhang
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
As part of the search for a phase transition or critical point on the QCD phase diagram, an energy scan including 5 different energy settings was performed during the 2010 RHIC heavy ion run. While the top beam energy for heavy ions is at 100 GeV/n and the lowest achieved energy setpoint was significantly below RHICs injection energy of approximately 10 GeV/n, we also provided beams for data taking in a medium energy range above injection energy and below top beam energy. This paper reviews RHIC experience and challenges for RHIC medium energy operations that produced full experimental data sets at beam energies of 31.2 GeV/n and 19.5 GeV/n.
 
 
THP064 The Dipole Corrector Magnets for the RHIC Fast Global Orbit Feedback System 2249
 
  • P. Thieberger, L. Arnold, C. Folz, R.L. Hulsart, A.K. Jain, R. Karl, G.J. Mahler, W. Meng, K. Mernick, R.J. Michnoff, M.G. Minty, C. Montag, V. Ptitsyn, J. Ritter, L. Smart, J.E. Tuozzolo, J. White
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
The recently completed RHIC fast global orbit feedback system uses 24 small “window-frame” horizontal dipole correctors. Space limitations dictated a very compact design. The magnetic design and modelling of these laminated yoke magnets is described as well as the mechanical implementation, coil winding, vacuum impregnation, etc. Test procedures to determine the field quality and frequency response are described. The results of these measurements are presented and discussed. A small fringe field from each magnet, overlapping the opposite RHIC ring, is compensated by a correction winding placed on the opposite ring’s magnet and connected in series with the main winding of the first one. Results from measurements of this compensation scheme are shown and discussed.