Author: Kang, Y.W.
Paper Title Page
MOP257 High Power RF Distribution and Control for Multi-Cavity Cryomodule Testing 591
 
  • Y.W. Kang, M. Broyles, M.T. Crofford, X. Geng, S.-H. Kim, S.W. Lee, C.L. Phibbs, K.R. Shin, W.H. Strong
    ORNL, Oak Ridge, Tennessee, USA
 
  Funding: This work was supported by SNS through UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. DOE.
The SNS has been successfully operating 81 superconducting six-cell cavities in 23 cryomodules in its linac to achieve the goals in beam power and energy. For near-term production of spare cryomodules and the upcoming power upgrade project that will need 36 additional cavities in 9 cryomodules, high RF power testing and qualification of the cavities is required in the RF test facility. Simultaneously powering all the cavities in a cryomodule is considered desirable for robust conditioning and studying of cavity field emission since certain cavities exhibit field emissions that could be mutually coupled. A four-way variable output power waveguide splitting system is being prepared for testing cryomodules with up to four cavities. The splitting system is fed by an 805 MHz, 5 MW peak power pulsed klystron. The power output at each arm can be adjusted in both amplitude and phase to wide ranges of values using two mechanical waveguide phase shifters that form a vector modulator. The system control is implemented in the EPICS environment similar to the main accelerator controls. The work performed on the design, integration, operation, and test of the system are presented.
 
 
TUP012 Computer Simulations of Waveguide Window and Coupler Iris for Precision Matching 832
 
  • S.W. Lee
    ORNL RAD, Oak Ridge, Tennessee, USA
  • Y.W. Kang, K.R. Shin, A.V. Vassioutchenko
    ORNL, Oak Ridge, Tennessee, USA
 
  Funding: This work was supported by SNS through UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. DOE.
A tapered ridge waveguide iris input coupler and a waveguide ceramic disk windows are used on each of six drift tube linac (DTL) cavities in the Spallation Neutron Source (SNS). The coupler design employs rapidly tapered double ridge waveguide to reduce the cross section down to a smaller low impedance transmission line section that can couple to the DTL tank easily. The impedance matching is done by adjusting the dimensions of the thin slit aperture between the ridges that is the coupling element responsible for the power delivery to the cavity. Since the coupling is sensitive to the dimensional changes of the aperture, it requires careful tuning for precise matching. Accurate RF simulation using latest 3-D EM code is desirable to help the tuning for maintenance and spare manufacturing. Simulations are done for the complete system with the ceramic window and the coupling iris on the cavity to see mutual interaction between the components as a whole.
 
 
WEP185 Properties of Longitudinally Uniform Beam Waveguides 1834
 
  • Y.W. Kang
    ORNL, Oak Ridge, Tennessee, USA
  • R. Kustom, R. Nassiri
    ANL, Argonne, USA
 
  Funding: This work was supported by SNS through UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. DOE.
Beam waveguide (BWG) geometry with two longitudinally uniform concave reflectors can support quasi-optical transverse resonances of electromagnetic waves and longitudinal power transmission. The quasi-optical resonance in BWG can be treated as a Gaussian beam. The BWG are often known to have high Q-factors while operating in higher order modes. The latest interests on these beam waveguides are the application for microwave or millimeter wave undulators for synchrotron radiation. The general properties of the BWG are discussed with the field solutions and dispersion properties derived with elliptical beam waveguides approximation. Potential applications of BWG for supporting circularly polarized wave are discussed.
 
 
WEP274 Broadband Antenna Matching Network Design and Application for RF Plasma Ion Source 1990
 
  • K.R. Shin
    ORNL RAD, Oak Ridge, Tennessee, USA
  • A.E. Fathy
    University of Tennessee, Knoxville, Tennessee, USA
  • Y.W. Kang, M.F. Piller
    ORNL, Oak Ridge, Tennessee, USA
 
  Funding: This work was supported by SNS through UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. DOE.
The RF ion source at Spallation Neutron Source has been upgraded to meet higher beam power requirement. One important subsystem for efficient operation of the ion source is the 2MHz RF impedance matching network. The real part of the antenna impedance is very small and is affected by plasma density for 2MHz operating frequency. Previous impedance matching network for the antenna has limited tuning capability to cover this potential variation of the antenna impedance since it employed a single tuning element and an impedance transformer. A new matching network with two tunable capacitors has been built and tested. This network can allow precision matching and increase the tunable range without using a transformer. A 5-element broadband matching network also has been designed, built and tested. The 5-element network allows wide band matching up to 50 kHz bandwidth from the resonance center of 2 MHz. The design procedure, simulation and test results are presented.
 
 
WEP275 Highly-Persistent SNS H Source Fueling 1-MW Beams with 7-9 kC Service Cycles 1993
 
  • M.P. Stockli, T.W. Hardek, Y.W. Kang, S.N. Murray, T.R. Pennisi, M.F. Piller, M. Santana, R.F. Welton
    ORNL, Oak Ridge, Tennessee, USA
  • B. Han
    ORNL RAD, Oak Ridge, Tennessee, USA
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy.
Running routinely with ~40-mA, 1-MW beams, the SNS linac is fed from the ion source with ~1ms long, ~50-mA H beam pulses at 60 Hz. This requires the daily extraction of ~230 C of H ions, which exceeds the routine daily production of other H accelerator sources by almost an order of magnitude. The source service cycle has been extended from 2, to 3, to 4, and up to 5.6 weeks without age-related failures. The 7-9 kC of H ions delivered in single service cycles exceed the service cycle yields of other accelerator sources. The paper discusses the findings as well as the issues and their mitigations, which enabled the simultaneous increase of the beam current, the duty factor, the availability, and the service cycle.
 
 
THOAS3 Status of the Oak Ridge Spallation Neutron Source (SNS) RF Systems 2050
 
  • T.W. Hardek, M.T. Crofford, Y.W. Kang, M.F. Piller, A.V. Vassioutchenko
    ORNL, Oak Ridge, Tennessee, USA
  • S.W. Lee, M.E. Middendorf
    ORNL RAD, Oak Ridge, Tennessee, USA
 
  The SNS has been delivering production neutrons for five years with first beam delivered to the neutron target at the end of April 2006. On September 18, 2009 SNS officially reached 1 megawatt of beam on target marking the achievement of a decades-old dream of providing a U.S. megawatt class pulsed spallation source. The SNS is now routinely delivering 1 megawatt of beam power to the neutron target at over 85 percent of the scheduled beam time. The present effort is aimed at increasing availability eventually to 95 percent and gradually increasing the intensity to the 1.4 megawatt design level. While the RF systems have performed well since initial installation some improvements have been implemented. This paper provides a review of the SNS RF Systems, an overview of the performance of the various components and a detailed review of RF related issues addressed over the past several years.  
slides icon Slides THOAS3 [2.759 MB]