Weingarten, W.

Paper Title Page
MOP055 Plans for a Superconducting H- Linac (SPL) at CERN 202
 
  • R. Garoby, O. Brunner, S. Calatroni, E. Ciapala, F. Gerigk, A.M. Lombardi, R. Losito, V. Parma, C. Rossi, J. Tuckmantel, M. Vretenar, W. Weingarten
    CERN, Geneva
 
 

As part of the upgrade of the LHC injector complex at CERN, the construction of a 4 GeV Superconducting Proton Linac (the SPL, in fact an H- accelerator) is planned to begin in 2012. Depending upon physics requests, it should be upgradeable to 5 GeV and multi-MW beam power at a later stage. The construction of Linac4, its low energy front end, has started at the beginning of 2008. A full project proposal with a cost estimate for the low power version of the SPL aimed at improving LHC performance has to be ready for mid-2011. As a first step towards that goal, essential machine parameters like rf frequency, cooling temperature and beam current have recently been revisited and plans have been drawn for designing and testing critical components. The SPL parameters are reviewed in the context of the CERN plans for upgrading the LHC injectors, and the foreseen developments during the next years are described.