Paper | Title | Page |
---|---|---|
MOP017 | The Proposed ISAC-III (ARIEL) Low-Energy Area and Accelerator Upgrades | 94 |
|
||
The ISAC-III proposal is a ten year plan to triple the amount of radioactive ion beam (RIB) time at the facility. The plan includes the addition of two new independent target stations with a design suitable for actinide target materials, a second 500 MeV proton beam line from the TRIUMF cyclotron and a new 50 MeV electron linac as a complementary driver to provide RIBs through photo-fission. The two new target stations will require a new mass-separator and low-energy beam-transport complex to deliver the additional beams to the ISAC experimental facilities. It is also proposed to install a new linear accelerator section to provide the capability for two simultaneous accelerated RIBs to experimenters. This paper will describe the proposed installations in the low-energy transport and accelerator sections of the ISAC complex. |