A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Schulte, D.

Paper Title Page
TUP016 Status of an Automatic Beam Steering for the CLIC Test Facility 3 422
 
  • E. Adli, R. Corsini, A.E. Dabrowski, D. Schulte, H. Shaker, P.K. Skowronski, F. Tecker, R. Tomás
    CERN, Geneva
 
 

An automatic beam steering application for CTF 3 is being designed in order to automatize operation of the machine, as well as providing a test-bed for advanced steering algorithms for CLIC. Beam-based correction including dispersion free steering have been investigated. An approach based on a PLACET on-line model has been tested. This paper gives an overview of the current status and the achieved results of the CTF3 automatic steering.

 
TUP055 Optimum Frequency and Gradient for the CLIC Main Linac Accelerating Structure 527
 
  • A. Grudiev, H.-H. Braun, D. Schulte, W. Wuensch
    CERN, Geneva
 
 

Recently the CLIC study has changed the operating frequency and accelerating gradient of the main linac from 30 GHz and 150 MV/m to 12 GHz and 100 MV/m, respectively. This major change of parameters has been driven by the results from a novel main linac optimization procedure. The procedure allows simultaneous optimization of operating frequency, accelerating gradient, and many other parameters of CLIC main linac. It takes into account both beam dynamics (BD) and high power rf constraints. BD constraints are related to emittance growth due to short- and long-range transverse wakefields. Rf constraints are related to rf breakdown and pulsed surface heating of the accelerating structure. The optimization figure of merit includes the power efficiency, measured as a ratio of luminosity to the input power as well as a quantity proportional to investment cost.

 
THP023 Crab Cavities for Linear Colliders 830
 
  • G. Burt, P.K. Ambattu, R.G. Carter, A.C. Dexter, M.I. Tahir
    Cockcroft Institute, Lancaster University, Lancaster
  • C. Adolphsen, Z. Li, A. Seryi, L. Xiao
    SLAC, Menlo Park, California
  • C.D. Beard, D.M. Dykes, P. Goudket, A. Kalinin, L. Ma, P.A. McIntosh
    STFC/DL/ASTeC, Daresbury, Warrington, Cheshire
  • L. Bellantoni, B. Chase, M. Church, T.N. Khabiboulline
    Fermilab, Batavia
  • R.M. Jones
    UMAN, Manchester
  • A. Latina, D. Schulte
    CERN, Geneva
 
 

Crab cavities have been proposed for a wide number of accelerators and interest in crab cavities has recently increased after the successful operation of a pair of crab cavities in KEK-B. In particular crab cavities are required for both the ILC and CLIC linear colliders for bunch alignment. Consideration of bunch structure and size constraints favours a 3.9 GHz superconducting, multi-cell cavity as the ILC solution, whilst bunch structure and beam-loading considerations suggest an X-band copper travelling wave structure for CLIC. These two cavity solutions are very different in design but share complex design issues. Phase stabilisation, beam loading, wakefields and mode damping are special issues for these crab cavities. Requirements and potential design solutions will be discussed for both colliders.