A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Pei, G.

Paper Title Page
TUP014 Present Status of the BEPCII Linac 419
 
  • G. Pei
    IHEP Beijing, Beijing
 
 

After the major upgrade in 2005, the BEPC injector linac has been commissioning and working smoothly for more than two years. A 2.1 GeV, 66 mA positron beam at the linac end has been obtained, and the highest injection rate into the ring of 80 mA/min. at 50 pps is reached, much higher than the design goal of 50 mA/min. The machine is working stable, the mal function was about 2% in the past two years, including the system test and the commissioning.