A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Nantista, C.D.

Paper Title Page
THP073 Progress in L-Band Power Distribution System R&D at SLAC 960
 
  • C.D. Nantista, C. Adolphsen, F. Wang
    SLAC, Menlo Park, California
 
 

Funding: Work supported by the U.S. Department of Energy under contract DE-AC02-76SF00515.
We report on the L-band rf power distribution system (PDS) developed at SLAC for Fermilab's NML superconducting test accelerator facility. The makeup of the system, which allows tailoring of the power distribution to cavities by pairs, is briefly described. Cold test measurements of the system and the results of high power processing are presented. We also investigate the feasibility of eliminating the expensive, lossy circulators from the PDS in the ILC linacs by taking advantage of our scheme of pair-feeding through 3-dB hybrids. A computational model is used to simulate the impact on field stability of inter-cavity coupling due to reduced isolation. Measurements of typically achievable hybrid port isolations provide the likely magnitude for such coupling.

 
THP074 A New Accelerator Structure Concept: the Zipper Structure 963
 
  • C.D. Nantista
    SLAC, Menlo Park, California
 
 

Funding: Work supported by the U.S. Department of Energy under contract DE-AC02-76SF00515.
I introduce a novel normal-conducting accelerator structure combining standing wave and traveling wave characteristics, with relatively open cells. I describe the concept and geometry, optimize parameters, and discuss the advantages and limitations this new structure presents.