A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Meusel, O.

Paper Title Page
MOP001 A Coupled RFQ-Drift Tube Combination for FRANZ 46
 
  • A. Bechtold, U. Bartz, M. Heilmann, P. Kolb, H. Liebermann, O. Meusel, D. Mäder, H. Podlech, U. Ratzinger, A. Schempp, C. Zhang
    IAP, Frankfurt am Main
  • G. Clemente
    GSI, Darmstadt
 
 

Funding: Work supported by BMBF
The Frankfurt Neutron Source at the Stern-Gerlach-Zentrum will comprise a short 175 MHz linac sequence consisting of a 1.4 m long 700 keV 4-rod type RFQ followed by a 50 cm IH-DTL for proton acceleration up to 2 MeV. The beam current is 200 mA at pulsed and 30 mA at cw operation. The aim is to have a very compact device driven by only one rf amplifier to reduce costs and required installation space. A coupling between the RFQ and the IH resonators by means of a galvanic connection is foreseen, which is realized by two brackets going right away through a common partitioning end flange lid. The accelerators could also be driven separately by just removing the brackets. The distance between the end of the RFQ electrodes and the middle of the first DTL gap is only 5 cm, there is no additional beam optics in between. Preliminary beam dynamics and rf simulations have been carried out together with accompanying measurements on rf models.

 
MOP002 Injector Development for High Intensity Proton Beams at Stern-Gerlach-Zentrum 49
 
  • O. Meusel, A. Bechtold, L.P. Chau, M. Heilmann, H. Podlech, U. Ratzinger, K. Volk, C. Wiesner
    IAP, Frankfurt am Main
 
 

The Frankfurter neutron source at Stern-Gerlach-Zentrum (SGZ) uses a proton injector as a driver for the 7Li(p,n) neutron production. A volume type ion source will deliver a 100 keV, 200 mA proton beam continuously. It is intended to use a LEBT section consisting of four solenoids to transport the beam and to match it into the acceptance of the RFQ. A chopper system between solenoid 2 and 3 will provide beam pulses with a length of about 100 ns with a repetition rate of 250 kHz. The RFQ and the following IH drift tube LINAC will be coupled together to achieve an efficiency beam acceleration. Furthermore only one power amplifier will be needed to provide the rf power for both accelerator stages. The Mobley type bunch compressor will merge 7 micro-bunches formed in the accelerator module to one single 1ns bunch with an estimated peak current of about 8.6 A. A rebuncher will provide the post acceleration at a final beam energy adjustable between 1.8 and 2.4 MeV. The whole injector suffers from the high beam intensity and therefore high space charge forces. It will gives the opportunity to develop new accelerator concepts and beam diagnostic technics.