MOP111 Control Systems for Linac Test Facilities at Fermilab 334
 
  • J.F. Patrick, S.L. Lackey
    Fermilab, Batavia
 
 

Funding: *Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy.
Fermilab* is constructing superconducting rf test facilities for development of technologies to be used in future Linac projects. Two of these facilities, the High Intensity Neutrino Source and the New Muon Laboratory, are proto-type Linacs which will run with beam. The requirements for these facilities vary but all involve collaboration and flexibility for integrating various new instruments. Tight timing requirements and automation are also required. Some facilities require integration into the existing Fermilab Control system. The controls also must be robust so as not to interfere with the main purpose of the facilities. We will outline the plan for accomplishing this task as well as the current status.