A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Kudou, T.

Paper Title Page
TUP009 Development of Timing and Control Systems for Fast Beam Switch at KEK 8 GeV Linac 404
 
  • K. Furukawa, M. Satoh, T. Suwada
    KEK, Ibaraki
  • A. Kazakov
    GUAS/AS, Ibaraki
  • T. Kudou, S. Kusano
    MELCO SC, Tsukuba
  • G. Lei, G.X. Xu
    IHEP Beijing, Beijing
 
 

The 8 GeV Linac at KEK provides electrons and positrons to Photon Factory (PF) and B-Factory (KEKB). Simultaneous top-up injections have been considered for both PF and KEKB rings in order to improve the injection efficiency and the stability. Fast beam-switching mechanisms are being implemented, upgrading the timing and control systems. While the present system provides precise timing signals for 150 devices, many of the signals will be dynamically switched using an event system. A new scheme has been developed and tested to enable double-fold synchronization between rf signals. Fast controls of low-level rf, beam instrumentation, a kicker, a gun, and beam operation parameters will also be upgraded.