MOP046 | Commissioning of the New GSI-Charge State Separator System for High Current Heavy Ion Beams | 175 |
|
||
A dedicated charge separator system is now installed in the transfer line to the GSI-synchrotron SIS18. In former times charge separation was performed with a single 11 degree dipole magnet after a 25 m beam transport section. This was not adequate to meet the requirements during high current operation for FAIR: it only allows for charge state separation of low intensity and low emittance beams. With the new compact charge separator system emittance blow up and unwanted beam losses for high intensity beam operation will be avoided. Additionally a new beam diagnostics test bench is integrated. With this the beam parameters (ion current, beam profile, beam position, transversal emittance, bunch structure and beam energy) for the injection into the SIS18 can be measured in parallel to the routine operation in the transfer line. Results of the commissioning with high intensity argon beams as well as with an uranium beam will be reported. |
||
MOP075 | Benchmarking of Measurement and Simulation of Transverse RMS-Emittance Growth Along an Alvarez DTL | 251 |
|
||
Funding: CARE, contract number RII3-CT-2003-506395) European Community INTAS Project Ref. no. 06-1000012-8782 |
||
MOP106 | Prediction of 4ν=1 Resonance of a High Intensity Linac | 323 |
|
||
The 4ν=1 resonance of a linac is found when the depressed tune is around 90 deg. It is observed that this fourth order resonance is dominating over the better known envelope instability and practically replacing it. Simulation study shows a clear emittance growth by this resonance and its stopband. Experimental measurement of the stopband of this resonance is proposed and conducted in early 2008 using the UNILAC at GSI. This study will serve as a excellent benchmarking. |
||
THP078 | High Power RF Supplies for the FAIR Injector Linacs | 975 |
|
||
During the LINAC conference in Knoxville 2006 the operating frequency of the FAIR proton linac was fixed at 325.224 MHz. Even though the six CH-Structures need slightly different rf levels, the proton linac will be equipped with identical rf power sources. That applies although for the RFQ structure. To supply the FAIR accelerators with a good beam quality by the UNILAC as the high current heavy ion injector for FAIR, as well as an high duty factor accelerator for nuclear physics experiments, different upgrades and modifications have to be made at the rf components. In addition there has to be an upgrade for a planned 50% duty cycle mode, higher beam load within the post-stripper section as well as the provision of an excellent rf operation for the next 30 years. Discussions on possible collaborations with CERN in terms of LLRF and the combining of the procurement for tube amplifiers for bunching cavities are on the way. This paper describes the actual status of the proton linac rf system and the future requirements for the existing UNILAC rf systems. |