Paper | Title | Page |
---|---|---|
THP025 | Superconducting Quarter-Wave Resonators for the ATLAS Energy Upgrade | 836 |
|
||
A set of six new 109 MHz β=0.15 superconducting quarter-wave resonators (QWR) has been built at ANL as part of an upgrade to the ATLAS superconducting heavy-ion linac. The final cavity string assembly will also use many of the techniques needed for the next generation of large high-performance ion linacs such as the U.S. Department of Energy's FRIB project. Single-cavity cold tests at T=4.5 K have been performed for three cavities with moveable coupler, rf pickup, and VCX fast tuner as required for the full 6-meter cryomodule assembly. The average maximum accelerating gradient of 4 cavities (3 new + 1 prototype), is EACC=11.2 MV/m (BPEAK=65 mT). Clean cavity string assembly techniques, required here and for most future SRF ion linacs, are fairly well developed. Details on cavity performance including high-field cw operation, microphonics and fast tuning are presented. |
||
THP026 | Surface Processing Facilities for Superconducting RF Cavities at ANL | 839 |
|
||
New SRF cavity processing systems at ANL, including those for electropolishing (EP), high-pressure water rinsing (HPR), and single-cavity clean room assembly have been developed and operated at ANL for use with cavities for a range of electron and ion linac applications. Jointly with FNAL, systems for 1.3 GHz single- and multi-cell elliptical cavities for the linear collider effort have been developed. New systems for use with low-beta TEM-class cavities have also been built and used to process a set of new quarter-wave resonators as part of an upgrade to the ATLAS heavy-ion accelerator at ANL. All of the new hardware is located in a 200 m2 joint ANL/FNAL Superconducting Cavity Surface Process Facility (SCSPF) consisting of two separate chemical processing rooms, a clean anteroom, and a pair of class 10 and 100 clean rooms for HPR and clean assembly. Results of first cold tests for elliptical and TEM-class cavities processed in these facilities are presented. |