MOP040 The Radiofrequency Quadrupole Accelerator for the Linac4 157
 
  • C. Rossi, P. Bourquin, J.-B. Lallement, A.M. Lombardi, S.J. Mathot, M.A. Timmins, G. Vandoni, M. Vretenar
    CERN, Geneva
  • S. Cazaux, O. Delferrière, M. Desmons, R.D. Duperrier, A. France, D. Leboeuf, O. Piquet
    CEA, Gif-sur-Yvette
 
 

The first stage of acceleration in Linac4, the new 160 MeV CERN H- injector, is a 352 MHz, 3 m long Radiofrequency Quadrupole (RFQ) Accelerator. The RFQ will capture a 70 mA, 45 keV beam from the rf source and accelerate it to 3 MeV, an energy suitable for chopping and injecting the beam in a conventional Drift Tube Linac. Although the RFQ will be initially operated at low duty cycle (0.1%), its design is compatible with higher duty cycle (10%) as the front-end for a possible high-intensity upgrade of the CERN linac facility. The RFQ will be of the brazed-copper design and will be built and assembled at CERN. Beam dynamics design allows for a compact structure made of a single resonant unit. Field symmetry is ensured by fixed tuners placed along the structure. In this paper we present the rf and mechanical design, the beam dynamics and the sensitivity to fabrication and to rf errors.

 
THP006 704 MHz High Power Coupler and Cavity Development for High Power Pulsed Proton Linacs 786
 
  • G. Devanz, J.-P. Charrier, S. Chel, M. Desmons, Y. Gasser, A. Hamdi, P. Hardy, J. Plouin, D. Roudier
    CEA, Gif-sur-Yvette
 
 

In the framework of the European CARE-HIPPI program we develop components for superconducting high pulsed power proton linacs at 704 MHz. We have designed, fabricated and tested a beta 0.47 5-cell elliptical cavity with an optimized stiffening to reduce its sensitivity to Lorentz forces. A fast piezo tuner has been developed in order to be able to operate the cavity in pulsed mode in our horizontal test cryostat CryHoLab. We also have carried out the development of a fundamental power coupler. It is designed to transmit a power up to 1 MW at a 10% duty cycle. A high power test area has been setup consisting of a 1.2 MW klystron, a pulsed high voltage power supply and a coupler test stand.