Author: Yano, Y.
Paper Title Page
TUYB1 Progress of SuperKEKB 1291
 
  • T. Miura, T. Abe, T. Adachi, K. Akai, M. Akemoto, A. Akiyama, D.A. Arakawa, Y. Arakida, Y. Arimoto, M. Arinaga, K. Ebihara, K. Egawa, A. Enomoto, J.W. Flanagan, S. Fukuda, H. Fukuma, Y. Funakoshi, K. Furukawa, T. Furuya, K. Hara, T. Higo, H. Hisamatsu, H. Honma, T. Honma, R. Ichimiya, N. Iida, H. Iinuma, H. Ikeda, M. Ikeda, T. Ishibashi, H. Ishii, M. Iwasaki, A. Kabe, T. Kageyama, H. Kaji, K. Kakihara, S. Kamada, T. Kamitani, S. Kanaeda, K. Kanazawa, H. Katagiri, S. Kato, S. Kazama, M. Kikuchi, T. Kobayashi, H. Koiso, Y. Kojima, M. Kurashina, K. Marutsuka, M. Masuzawa, S. Matsumoto, T. Matsumoto, H. Matsushita, S. Michizono, K. Mikawa, T. Mimashi, F. Miyahara, K. Mori, T. Mori, A. Morita, Y. Morita, H. Nakai, H. Nakajima, T.T. Nakamura, K. Nakanishi, K. Nakao, H. Nakayama, T. Natsui, M. Nishiwaki, J.-I. Odagiri, Y. Ogawa, K. Ohmi, Y. Ohnishi, S. Ohsawa, Y. Ohsawa, N. Ohuchi, K. Oide, T. Oki, M. Ono, H. Sakai, Y. Sakamoto, S. Sasaki, M. Sato, M. Satoh, K. Shibata, T. Shidara, M. Shirai, A. Shirakawa, M. Suetake, Y. Suetsugu, R. Sugahara, H. Sugimoto, T. Suwada, S. Takasaki, T. Takatomi, T. Takenaka, Y. Takeuchi, M. Tanaka, M. Tawada, S. Terui, M. Tobiyama, N. Tokuda, K. Tsuchiya, X. Wang, K. Watanabe, H. Yamaoka, Y. Yano, K. Yokoyama, Ma. Yoshida, M. Yoshida, S.I. Yoshimoto, K. Yoshino, R. Zhang, D. Zhou, X. Zhou, Z.G. Zong
    KEK, Ibaraki, Japan
  • D. Satoh
    TIT, Tokyo, Japan
 
  This presentation will cover the status of the installation and the injector commissioning status of SuperKEKB. The IR optics and design with very low β* of less than 1 mm will be discussed.  
slides icon Slides TUYB1 [6.588 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUYB1  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUBC1 Recent Progress and Operational Status of the Compact ERL at KEK 1359
 
  • S. Sakanaka, M. Adachi, S. Adachi, T. Akagi, M. Akemoto, D.A. Arakawa, S. Araki, S. Asaoka, M. Egi, K. Enami, K. Endo, S. Fukuda, T. Furuya, K. Haga, K. Hara, K. Harada, T. Honda, Y. Honda, H. Honma, T. Honma, K. Hosoyama, K. Hozumi, A. Ishii, X.J. Jin, E. Kako, Y. Kamiya, H. Katagiri, H. Kawata, Y. Kobayashi, Y. Kojima, Y. Kondou, A. Kosuge, T. Kume, T. Matsumoto, H. Matsumura, H. Matsushita, S. Michizono, T. Miura, T. Miyajima, H. Miyauchi, S. Nagahashi, H. Nakai, H. Nakajima, N. Nakamura, K. Nakanishi, K. Nakao, K.N. Nigorikawa, T. Nogami, S. Noguchi, S. Nozawa, T. Obina, T. Ozaki, F. Qiu, H. Sagehashi, H. Sakai, S. Sasaki, K. Satoh, T. Shidara, M. Shimada, K. Shinoe, T. Shioya, T. Shishido, M. Tadano, T. Tahara, T. Takahashi, R. Takai, H. Takaki, T. Takenaka, O. Tanaka, Y. Tanimoto, N. Terunuma, M. Tobiyama, K. Tsuchiya, T. Uchiyama, A. Ueda, K. Umemori, J. Urakawa, K. Watanabe, M. Yamamoto, Y. Yamamoto, Y. Yano, M. Yoshida
    KEK, Ibaraki, Japan
  • E. Cenni
    Sokendai, Ibaraki, Japan
  • R. Hajima, S. Matsuba, M. Mori, R. Nagai, N. Nishimori, M. Sawamura, T. Shizuma
    JAEA, Ibaraki-ken, Japan
  • J.G. Hwang
    KNU, Deagu, Republic of Korea
  • M. Kuriki
    Hiroshima University, Graduate School of Science, Higashi-Hiroshima, Japan
  • Y. Seimiya
    HU/AdSM, Higashi-Hiroshima, Japan
 
  Funding: Work supported by the Photon and Quantum Basic Research Coordinated Development Program from the MEXT, and by the MEXT grant for promoting technology for nuclear security.
The Compact Energy Recovery Linac (cERL) is a superconducting test accelerator aimed at establishing technologies for the ERL-based future light source. After its construction during 2009 to 2013, the first CW beams of 20 MeV were successfully transported through the recirculation loop in February 2014*. Then, initial tuning of beams and evaluations of beam properties were carried out. From September to December in 2014, we are constructing a Laser Compton Scattering (LCS) source** which aims at demonstrating technology for the future high-flux quasi-monochromatic gamma-ray source. In the next run of the cERL, which begins at the end of January 2015, we plan such works as an increase in the beam current (from 10 uA to 100 uA), commissioning of the LCS source, and sustained tuning of beams for lower emittance. We will report up-to-date results of these developments.
* N. Nakamura et al., IPAC2014, MOPRO110; S. Sakanaka et al., LINAC14, TUPOL01.
** R. Nagai et al., IPAC2014, WEPRO003.
 
slides icon Slides TUBC1 [2.679 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUBC1  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPTY008 Commissioning Status and Plan of SuperKEKB Injector Linac 2013
 
  • M. Satoh, M. Akemoto, D.A. Arakawa, Y. Arakida, A. Enomoto, Y. Enomoto, S. Fukuda, Y. Funakoshi, K. Furukawa, T. Higo, H. Honma, N. Iida, M. Ikeda, H. Iwase, H. Kaji, K. Kakihara, T. Kamitani, H. Katagiri, S. Kazama, M. Kikuchi, H. Koiso, M. Kurashina, S. Matsumoto, T. Matsumoto, H. Matsushita, S. Michizono, K. Mikawa, T. Mimashi, T. Miura, F. Miyahara, T. Mori, A. Morita, H. Nakajima, K. Nakao, T. Natsui, Y. Ogawa, Y. Ohnishi, S. Ohsawa, Y. Seimiya, T. Shidara, A. Shirakawa, M. Suetake, H. Sugimoto, T. Suwada, T. Takenaka, M. Tanaka, M. Tawada, Y. Yano, K. Yokoyama, M. Yoshida, R. Zhang, X. Zhou
    KEK, Ibaraki, Japan
  • D. Satoh
    TIT, Tokyo, Japan
 
  Toward SuperKEKB project, the injector linac upgrade is ongoing at KEK in order to deliver the low emittance electron/positron beams with the high intensity and small emittance. In the September of 2013, the injector linac commissioning has started. In this presentation, we will describe the commissioning status and plan of SuperKEKB injector linac.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPTY008  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)