Author: Yang, X.
Paper Title Page
MOPMN001 Linear Optics and Coupling Correction with Turn-by-turn BPM Data 698
 
  • X. Huang
    SLAC, Menlo Park, California, USA
  • X. Yang
    BNL, Upton, Long Island, New York, USA
 
  We propose a method to measure and correct storage ring linear optics and coupling with turn-by-turn BPM data. The independent component analysis (ICA) is used to obtain the amplitudes and phase advances of the betatron normal modes, which are compared to their counterparts derived from the lattice model. By fitting the model to the data with quadrupole and skew quadrupole variables, the linear optics and coupling of the machine can be obtained. Simulation demonstrates that errors in the lattice and BPM parameters can be recovered with this method. Experiments on the NSLS-II storage ring show that it can find the same optics as the linear optics from closed orbit (LOCO) method.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-MOPMN001  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPMA050 NSLS-II Injector Commissioning and Initial Operation 1944
 
  • E.B. Blum, B. Bacha, G. Bassi, J. Bengtsson, A. Blednykh, S. Buda, W.X. Cheng, J. Choi, J. Cupolo, R. D'Alsace, M.A. Davidsaver, J.H. De Long, L. Doom, D.J. Durfee, R.P. Fliller, M. Fulkerson, G. Ganetis, F. Gao, C. Gardner, W. Guo, R. Heese, Y. Hidaka, Y. Hu, M.P. Johanson, B.N. Kosciuk, S. Kowalski, S.L. Kramer, S. Krinsky, Y. Li, W. Louie, M.A. Maggipinto, P. Marino, J. Mead, J. Oliva, D. Padrazo, K. Pedersen, B. Podobedov, R.S. Rainer, J. Rose, M. Santana, S. Seletskiy, T.V. Shaftan, O. Singh, P. Singh, V.V. Smaluk, R.M. Smith, T. Summers, J. Tagger, Y. Tian, W.H. Wahl, G.M. Wang, G.J. Weiner, F.J. Willeke, L. Yang, X. Yang, E. Zeitler, E. Zitvogel, P. Zuhoski
    BNL, Upton, Long Island, New York, USA
  • A. Akimov, P.B. Cheblakov, I.N. Churkin, A.A. Derbenev, S.M. Gurov, S.E. Karnaev, V.A. Kiselev, A.A. Korepanov, E.B. Levichev, S.V. Sinyatkin, A.N. Zhuravlev
    BINP SB RAS, Novosibirsk, Russia
 
  The injector for the National Synchrotron Light Source II storage ring consists of a 3 GeV booster synchrotron and a 200 MeV S-band linac. The linac was designed to produce either a single bunch with a charge of 0.5 nC of electrons or a train of bunches up to 300 ns long containing a total charge of 15 nC. The booster was designed to accelerate up to 15 nC each cycle. Linac commissioning was completed in April 2012. Booster commissioning was started in November 2013 and completed in March 2014. All of the significant design goals were satisfied including beam emittance, energy spread, and transport efficiency. While the maximum booster charge accelerated was only 10 nC this has proven to be more than sufficient for storage ring commissioning. The injector has operated reliably during storage ring operation since then. Results will be presented showing measurements of injector operating parameters achieved during commissioning and initial operation. Operating experience and reliability during the first year of NSLS-II operation will be discussed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPMA050  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPMA053 Experience with First Turns Commissioning in NSLS-II Storage Ring 1950
 
  • S. Seletskiy, G. Bassi, J. Bengtsson, A. Blednykh, E.B. Blum, W.X. Cheng, J. Choi, R.P. Fliller, W. Guo, R. Heese, Y. Hidaka, S.L. Kramer, Y. Li, B. Podobedov, T.V. Shaftan, G.M. Wang, F.J. Willeke, L. Yang, X. Yang
    BNL, Upton, Long Island, New York, USA
 
  In this paper we describe our experience with commissioning of the first turns in the NSLS-II storage ring. We discuss the problems that we encountered and show how applying a dedicated first turns commissioning software allowed us to diagnose and resolve these problems.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPMA053  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPHA005 Tools for NSLS II Commissioning 1971
 
  • G.M. Wang, G. Bassi, A. Blednykh, W.X. Cheng, J. Choi, L.R. Dalesio, M.A. Davidsaver, J.H. De Long, K. Ha, Y. Hidaka, Y. Hu, Y. Li, D. Padrazo, S. Seletskiy, T.V. Shaftan, G. Shen, K. Shroff, O. Singh, T. Summers, Y. Tian, F.J. Willeke, H. Xu, L. Yang, X. Yang
    BNL, Upton, Long Island, New York, USA
 
  The National Synchrotron Light Source II (NSLS-II) is a state of the art 3 GeV third generation light source at Brookhaven National Laboratory. As many facilities worldwide, NSLS II uses the EPICS control system to monitor and control all accelerator hardware. Control system studio (CSS) is used for simple tasks such as monitoring, display, setting of PVs. browsing the historical data, et. al. For more complex accelerator physics applications, a collection of scripts are mainly written in Python and part from Matlab during commissioning. With the close collaboration and fully support from control group, more and more CSS features were developed for operation convenience and several high level applications are interfaced with users in CSS panels for daily use based on softiocs. This paper will present the tools that we have been using for commissioning.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPHA005  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPHA006 NSLS-II Storage Ring Insertion Device and Front-End Commissioning 1974
 
  • G.M. Wang, C. Amundsen, G. Bassi, J. Bengtsson, A. Blednykh, E.B. Blum, W.X. Cheng, J. Choi, O.V. Chubar, T.M. Corwin, M.A. Davidsaver, L. Doom, W. Guo, D.A. Harder, P. He, Y. Hidaka, Y. Hu, P. Ilinski, C.A. Kitegi, S.L. Kramer, Y. Li, M. Musardo, D. Padrazo, B. Podobedov, K. Qian, R.S. Rainer, J. Rank, S. Seletskiy, T.V. Shaftan, S.K. Sharma, O. Singh, V. Smalyuk, R.M. Smith, T. Summers, T. Tanabe, F.J. Willeke, L. Yang, X. Yang, L.-H. Yu
    BNL, Upton, Long Island, New York, USA
 
  The National Synchrotron Light Source II (NSLS-II) is a state of the art 3 GeV third generation light source at Brookhaven National Laboratory. In the spring 2014, the storage ring was commissioning up to 50 mA without insertion device. In the fall, the project beamlines, includes seven insertion devices on six ID ports were commissioned within two and a half months. These beamlines consist of IXS, HXN, CSX-1, CSX-2, CHX, SRX, and XPD-1, from the radiation sources elliptically polarizing undulator (EPU), damping wiggler (DW) and in vacuum undulator (IVU) to cover the VUV through the very hard x-ray range. In this paper, a number of commissioning and operation experiences are discussed here, such as injection, lifetime, ID residual field and compensation, source point stability, beam alignment and tools for control, monitor and beam protection.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPHA006  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPHA007 NSLS II Booster Extended Integration Test 1977
 
  • G.M. Wang, B. Bacha, A. Blednykh, E.B. Blum, W.X. Cheng, J. Choi, L.R. Dalesio, M.A. Davidsaver, J.H. De Long, R.P. Fliller, G. Ganetis, W. Guo, K. Ha, Y. Hu, W. Louie, T.V. Shaftan, G. Shen, O. Singh, Y. Tian, F.J. Willeke, L. Yang, X. Yang
    BNL, Upton, Long Island, New York, USA
  • P.B. Cheblakov, A.A. Derbenev, A.I. Erokhin, S.E. Karnaev, S.V. Sinyatkin
    BINP SB RAS, Novosibirsk, Russia
  • V.V. Smaluk
    DLS, Oxfordshire, United Kingdom
 
  The National Synchrotron Light Source II (NSLS-II) is a state of the art 3 GeV third generation light source at Brookhaven National Laboratory. While the installation activities in the booster-synchrotron are nearly completed and waiting for the authorization to start the booster commissioning, the injector and accelerator physics group have engaged into the Integrated Testing phase. We did the booster commissioning with simulated beam signals, called extended integrated testing (EIT) to prepare for the booster ring commissioning. It is to make sure the device function along with utilities, timing system and control system, to calibrate diagnostics system, debug High Level Applications, test and optimize all the operation screens to reduce the potential problems during booster commissioning with beam.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPHA007  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPHA008 NSLS-II Injector High Level Application Tools 1980
 
  • G.M. Wang, E.B. Blum, R.P. Fliller, Y. Hu, T.V. Shaftan, X. Yang
    BNL, Upton, Long Island, New York, USA
 
  The National Synchrotron Light Source II (NSLS-II) is a state of the art 3 GeV third generation light source at Brookhaven National Laboratory. The injection system consists of a 200 MeV linac, a 3 GeV booster synchrotron and transfer lines in connection of linac, booster and storage ring. The transfer lines, designed and built from BNL, are equipped with sufficient diagnostics to commission to characterize the beam parameters from linac and booster. In the paper, we summarized the high level applications tools, beam emittance, energy and energy spread measurement, developed during the injector commissioning.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPHA008  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPHA012 LOCO Application to NSLS2 SR Dispersion and Beta Beating Correction 1989
 
  • X. Yang
    BNL, Upton, Long Island, New York, USA
  • X. Huang, J.A. Safranek
    SLAC, Menlo Park, California, USA
 
  During the short run in early July, 2014, we made changes to the Matlab LOCO setup for NSLS-II and applied LOCO successfully to the machine. The MML setup was verified with I/O tests for all quadrupole families. The LOCO setup was further tested with an intentional quadrupole error. After the successful LOCO correction, the rms beta beat was reduced from the initial values of 5.5% x and 5.6% y, to 1.9% x and 1.0% y, respectively. The rms horizontal dispersion error was reduced from 21 mm to 6 mm. It is critical to keep the same closed orbit for LOCO correction to take effect. Because presently some correctors are nearly saturated, closed orbit cannot be controlled for additional iterations. We expect LOCO to achieve better optics correction after the orbit control is improved.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPHA012  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)