The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.
TY - CONF AU - Blum, E.B. AU - Akimov, A. AU - Bacha, B. AU - Bassi, G. AU - Bengtsson, J. AU - Blednykh, A. AU - Buda, S. AU - Cheblakov, P.B. AU - Cheng, W.X. AU - Choi, J. AU - Churkin, I.N. AU - Cupolo, J. AU - D'Alsace, R. AU - Davidsaver, M.A. AU - De Long, J.H. AU - Derbenev, A.A. AU - Doom, L. AU - Durfee, D.J. AU - Fliller, R.P. AU - Fulkerson, M. AU - Ganetis, G. AU - Gao, F. AU - Gardner, C. AU - Guo, W. AU - Gurov, S.M. AU - Heese, R. AU - Hidaka, Y. AU - Hu, Y. AU - Johanson, M.P. AU - Karnaev, S.E. AU - Kiselev, V.A. AU - Korepanov, A.A. AU - Kosciuk, B.N. AU - Kowalski, S. AU - Kramer, S.L. AU - Krinsky, S. AU - Levichev, E.B. AU - Li, Y. AU - Louie, W. AU - Maggipinto, M.A. AU - Marino, P. AU - Mead, J. AU - Oliva, J. AU - Padrazo, D. AU - Pedersen, K. AU - Podobedov, B. AU - Rainer, R.S. AU - Rose, J. AU - Santana, M. AU - Seletskiy, S. AU - Shaftan, T.V. AU - Singh, O. AU - Singh, P. AU - Sinyatkin, S.V. AU - Smaluk, V.V. AU - Smith, R.M. AU - Summers, T. AU - Tagger, J. AU - Tian, Y. AU - Wahl, W.H. AU - Wang, G.M. AU - Weiner, G.J. AU - Willeke, F.J. AU - Yang, L. AU - Yang, X. AU - Zeitler, E. AU - Zhuravlev, A.N. AU - Zitvogel, E. AU - Zuhoski, P. ED - Henderson, Stuart ED - Akers, Evelyn ED - Satogata, Todd ED - Schaa, Volker R.W. TI - NSLS-II Injector Commissioning and Initial Operation J2 - Proc. of IPAC2015, Richmond, VA, USA, May 3-8, 2015 C1 - Richmond, VA, USA T2 - International Particle Accelerator Conference T3 - 6 LA - english AB - The injector for the National Synchrotron Light Source II storage ring consists of a 3 GeV booster synchrotron and a 200 MeV S-band linac. The linac was designed to produce either a single bunch with a charge of 0.5 nC of electrons or a train of bunches up to 300 ns long containing a total charge of 15 nC. The booster was designed to accelerate up to 15 nC each cycle. Linac commissioning was completed in April 2012. Booster commissioning was started in November 2013 and completed in March 2014. All of the significant design goals were satisfied including beam emittance, energy spread, and transport efficiency. While the maximum booster charge accelerated was only 10 nC this has proven to be more than sufficient for storage ring commissioning. The injector has operated reliably during storage ring operation since then. Results will be presented showing measurements of injector operating parameters achieved during commissioning and initial operation. Operating experience and reliability during the first year of NSLS-II operation will be discussed. PB - JACoW CP - Geneva, Switzerland SP - 1944 EP - 1946 KW - booster KW - storage-ring KW - linac KW - operation KW - injection DA - 2015/06 PY - 2015 SN - 978-3-95450-168-7 DO - 10.18429/JACoW-IPAC2015-TUPMA050 UR - http://jacow.org/ipac2015/papers/tupma050.pdf ER -