Paper | Title | Page |
---|---|---|
MOPHA003 | Status of ATF2 IP-BPM Project | 777 |
|
||
The efforts during the second half of 2014 towards nano-metric beam position measurement and stabilization at the Interaction Point (IP) section of the Accelerator Test Facility (ATF) at KEK are presented. Recent improvements to the beam position monitor (BPM) data analysis and processing electronics, as well as the installation of a new set of C-Band BPMs, are reviewed. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-MOPHA003 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |