Author: Puccio, B.
Paper Title Page
MOPTY054 Fibre Monitoring System for the Beam Permit Loops at the LHC and Future Evolution of the Beam Interlock System 1054
 
  • C. García-Argos, R. Denz, S. Gabourin, C. Martin, B. Puccio, A.P. Siemko
    CERN, Geneva, Switzerland
 
  The optical fibres that transmit the beam permit loop signals at the CERN accelerator complex are deployed along radiation areas. This may result in increased attenuation of the fibres, which reduces the power margin of the links. In addition, other events may cause the links to not function properly and result in false dumps, reducing the availability of the accelerator chain and affecting physics data taking. In order to evaluate the state of the fibres, an out-of-band fibre monitoring system is proposed, working in parallel to the actual beam permit loops. The future beam interlock system to be deployed during LHC long shutdown 2 will implement online, real-time monitoring of the fibres, a feature the current system lacks. Commercial off-the-shelf components to implement the optical transceivers are proposed whenever possible instead of ad-hoc designs.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-MOPTY054  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPF090 Status and Plans for the Upgrade of the CERN PS Booster 3905
 
  • K. Hanke, D. Aguglia, M.E. Angoletta, W. Bartmann, C. Bedel, E. Benedetto, S. Bertolasi, C. Bertone, J. Betz, T.W. Birtwistle, A. Blas, J. Borburgh, C. Bracco, A.C. Butterworth, E. Carlier, S. Chemli, P. Dahlen, A. Dallocchio, G.P. Di Giovanni, T. Dobers, A. Findlay, R. Froeschl, A. Funken, S. Gabourin, J.L. Grenard, D. Grenier, J. Hansen, D. Hay, J.-M. Lacroix, P. Le Roux, L.A. Lopez Hernandez, C. Martin, A. Masi, B. Mikulec, Y. Muttoni, A. Newborough, D. Nisbet, M.R. Obrecht, M.M. Paoluzzi, S. Pittet, B. Puccio, J. Tan, J. Vollaire, W.J.M. Weterings
    CERN, Geneva, Switzerland
 
  CERN’s Proton Synchrotron Booster (PSB) is undergoing a major upgrade program in the frame of the LHC Injectors Upgrade (LIU) project. During the first long LHC shutdown (LS1) some parts of the upgrade have already been implemented, and the machine has been successfully re-commissioned. More work is planned for the upcoming end-of-year technical stops, notably in 2016/17, while most of the upgrade is planned to take place during the second long LHC shutdown (LS2). We report on the upgrade items already completed and commissioned, the first Run 2 beam performance and give a status of the ongoing design and integration work.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-THPF090  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)