Paper | Title | Page |
---|---|---|
MOPJE053 | NSLS-II Beam Lifetime Measurements and Modeling | 416 |
|
||
NSLS-II is a recently constructed 3 GeV synchrotron light source with design horizontal emittance values in sub-nm range. Achieving good beam lifetime is critically important for NSLS-II as it is closely tied in to such important operational aspects as top-off injection frequency, injector components wear, radiation protection and control, and others. In this paper we present lifetime-related commissioning results, describe our present understanding of beam lifetime at NSLS-II and extrapolate our models to the fully built-up machine operating at 500 mA design beam current. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-MOPJE053 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUAB2 | First Collective Effects Measurements in NSLS-II with ID's | 1332 |
|
||
Funding: Work supported by DOE contract DE-AC02-98CH10886. As another important milestone towards the final goal to store an average current of 500mA, the average current of 200mA, distributed within ~1000 bunches, was recently achieved in the NSLS-II storage ring after the installation of three Damping Wigglers and four In-Vacuum Undulators. First measurements of the collective effects and instability thresholds, both in single- and multi-bunch mode, are discussed. |
||
![]() |
Slides TUAB2 [2.691 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUAB2 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPMA050 | NSLS-II Injector Commissioning and Initial Operation | 1944 |
|
||
The injector for the National Synchrotron Light Source II storage ring consists of a 3 GeV booster synchrotron and a 200 MeV S-band linac. The linac was designed to produce either a single bunch with a charge of 0.5 nC of electrons or a train of bunches up to 300 ns long containing a total charge of 15 nC. The booster was designed to accelerate up to 15 nC each cycle. Linac commissioning was completed in April 2012. Booster commissioning was started in November 2013 and completed in March 2014. All of the significant design goals were satisfied including beam emittance, energy spread, and transport efficiency. While the maximum booster charge accelerated was only 10 nC this has proven to be more than sufficient for storage ring commissioning. The injector has operated reliably during storage ring operation since then. Results will be presented showing measurements of injector operating parameters achieved during commissioning and initial operation. Operating experience and reliability during the first year of NSLS-II operation will be discussed. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPMA050 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPMA053 | Experience with First Turns Commissioning in NSLS-II Storage Ring | 1950 |
|
||
In this paper we describe our experience with commissioning of the first turns in the NSLS-II storage ring. We discuss the problems that we encountered and show how applying a dedicated first turns commissioning software allowed us to diagnose and resolve these problems. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPMA053 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPMA054 | High Level Application for First Turns Commissioning in NSLS-II Storage Ring | 1953 |
|
||
The typical problems occurring during commissioning of the first turns in the storage rings include shorted coils or reversed polarity of the magnets, cross-cabling of magnets power supplies and reversed polarity of BPMs. In this paper we describe a dedicated high level control application, which was created and utilized for commissioning of the first turns in NSLS-II storage ring. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPMA054 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPMA055 | Analysis of Possible Beam Losses in the NSLS II Storage Ring | 1956 |
|
||
The NSLS-II accelerators are installed within radiation shielding walls that are designed to attenuate the radiation generated from an assumed beam loss power to a level of <0.5mrem/h at the outer surface of the bulk shield walls. Any operational losses greater than specified level are expected to be addressed by installing supplemental shielding near the loss point in order to attenuate the radiation outside the shield wall to the design level. In this paper we report the analysis of the electron beam mis-steering in the NSLS-II storage ring for the determination of supplementary shielding. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPMA055 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPMA056 | Analysis of Possible Beam Losses in the NSLS II BSR Transfer Line | 1959 |
|
||
The NSLS-II accelerators are installed within 0.8 – 1 m thick radiation shielding walls. The safety considerations require attenuating the radiation generated from possible electron beam losses to a level of <0.5mrem/h at the outer surface of the bulk shield walls. Any operational losses greater than specified level shall be addressed by installing supplemental shielding near the loss point. In this paper we discuss simulation studies that identified potential beam loss locations. Results of these studies were used for identification of imposed radiation risks and for specification of the supplemental shielding design necessary to mitigate those risks. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPMA056 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPHA006 | NSLS-II Storage Ring Insertion Device and Front-End Commissioning | 1974 |
|
||
The National Synchrotron Light Source II (NSLS-II) is a state of the art 3 GeV third generation light source at Brookhaven National Laboratory. In the spring 2014, the storage ring was commissioning up to 50 mA without insertion device. In the fall, the project beamlines, includes seven insertion devices on six ID ports were commissioned within two and a half months. These beamlines consist of IXS, HXN, CSX-1, CSX-2, CHX, SRX, and XPD-1, from the radiation sources elliptically polarizing undulator (EPU), damping wiggler (DW) and in vacuum undulator (IVU) to cover the VUV through the very hard x-ray range. In this paper, a number of commissioning and operation experiences are discussed here, such as injection, lifetime, ID residual field and compensation, source point stability, beam alignment and tools for control, monitor and beam protection. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPHA006 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |