Paper | Title | Page |
---|---|---|
TUPTY048 | Changes to the Transfer Line Collimation System for the High-Luminosity LHC Beams | 2124 |
|
||
The current LHC transfer line collimation system will not be able to provide enough protection for the high brightness beams in the high-luminosity LHC era. The new collimation system will have to attenuate more and be more robust than its predecessor. The active jaw length of the new transfer line collimators will therefore be 2.1 m instead of currently 1.2 m. The transfer line optics will have to be adjusted for the new collimator locations and larger beta functions at the collimators for absorber robustness reasons. In this paper the new design of the transfer line collimation system will be presented with its implications on transfer line optics and powering, maintainability, protection of transfer line magnets in case of beam loss on a collimator and protection of the LHC aperture | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPTY048 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPTY049 | Protection of Superconducting Magnets in Case of Accidental Beam Losses during HL-LHC Injection | 2128 |
|
||
Funding: Research supported by the High Luminosity LHC project. The LHC injection regions accommodate a system of beam-intercepting devices which protect superconducting magnets and other accelerator components in case of mis-steered injected beam or accidentally kicked stored beam, e.g. due to injection kicker or timing malfunctions. The brightness and intensity increase required by the High Luminosity (HL) upgrade of the LHC necessitates a redesign of some devices to improve their robustness and to reduce the leakage of secondary particle showers to downstream magnets. In this paper, we review possible failure scenarios and we quantify the energy deposition in superconducting coils by means of FLUKA shower calculations. Conceptual design studies for the new protection system are presented, with the main focus on the primary injection protection absorber (TDI) and the adjacent mask (TCDD). |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPTY049 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPTY051 | Injection Protection Upgrade for the HL-LHC | 2136 |
|
||
The injector complex of the LHC is undergoing important changes in the light of the LIU project to provide brighter beams to the LHC. For this reason and as part of the High Luminosity LHC project the injection protection system of the LHC will be upgraded in the Long Shutdown 2 (2018 - 2019) to be able to protect downstream elements against injection failures with the high brightness, high intensity HL-LHC beams. The upgraded LHC injection protection system will consist of a segmented injection protection absorber TDIS, and auxiliary collimators and masks. The layout modifications are described, and the machine element protection and absorber jaw robustness studies are presented for the new systems. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPTY051 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPMN068 | Upgrade of the CERN SPS Extraction Protection Elements TPS | 3083 |
|
||
In 2006 the protection devices upstream of the septa in both extraction channels of the CERN SPS to the LHC were installed. Since then, new beam parameters have been proposed for the SPS beam towards the LHC in the framework of the LIU project. The mechanical parameters and assumptions on which these protection devices presently have been based, need validation before the new upgraded versions can be designed and constructed. The paper describes the design assumptions for the present protection device and the testing program for the TPSG4 at HiRadMat to validate them. Finally the requirements and the options to upgrade both extraction protection elements in the SPS are described. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-WEPMN068 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPF099 | Upgrade of the SPS Ion Injection System | 3938 |
|
||
As part of the LHC Injectors Upgrade Project (LIU) the injection system into the SPS will be upgraded for the use with ions. The changes will include the addition of a Pulse Forming Line parallel to the existing PFN to power the kicker magnets MKP-S. With the PFL a reduced magnetic field rise time of 100 ns should be reached. The missing deflection strength will be given by two new septum magnets MSI-V, to be installed between the existing septum MSI and the kickers MKP-S. A dedicated ion dump will be installed downstream of the injection elements. The parameter lists of the elements and studies concerning emittance blow-up coming from the injection system are presented. The feasibility of the 100 ns kicker rise time and the small ripple of the septum power converter are presented. Material studies of the ion dump are presented together with the radiation impact. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-THPF099 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |