Paper |
Title |
Page |
WEPMA022 |
Progress of the Klystron and Cavity Test Stand for the FAIR Proton Linac |
2802 |
|
- A. Schnase, E. Plechov, J. Salvatore, G. Schreiber, W. Vinzenz
GSI, Darmstadt, Germany
- C. Joly, J. Lesrel
IPN, Orsay, France
|
|
|
In collaboration between the FAIR project, GSI, and CNRS, the IPNO lab provided the high power RF components for a cavity and klystron test stand. For initial operation of the 3 MW Thales TH2181 klystron at 325.224 MHz we received a high voltage modulator from CERN Linac 4 as a loan. Here we report, how we integrated the combination of klystron, high voltage modulator, and auxiliaries to accumulate operating experience. RF operation of the klystron started on a water cooled load, soon the circulator will be included and then the prototype CH cavity in the radiation shielded area will be powered. The 45 kW amplifiers for the 3 buncher structures of the FAIR proton Linac were checked at the test stand, and the results are presented here.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-WEPMA022
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|