Paper |
Title |
Page |
WEPMN033 |
The Fabrication of Prototype Normal Conducting Rebuncher for the MEBT in RISP |
3000 |
|
- H.J. Kim, M.O. Hyun, B.-S. Park
IBS, Daejeon, Republic of Korea
|
|
|
The Medium Energy Beam Transport (MEBT) system of RAON consists of several quadrupole magnets for controlling the transverse beam parameter at the entrance of the low energy linac, three normal-conducting (NC) re-bunchers to match the longitudinal beam ellipse into the acceptance of the low energy linac and several diagnostic devices. The NC QWR re-buncher, which has a frequency of 81.25 MHz, a geometric beta factor of 0.032, and an effective length of 24 cm, has been fabricated and tested to demonstrate the frequency tuning by using slug tuner, power transmission and reflection with low input power, and pulsed high power transmission with cooling channels. In this presentation, we show the design and fabrication criteria for the high power, ~ 10 kW, re-buncher and its test results.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-WEPMN033
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|