Paper | Title | Page |
---|---|---|
WEPTY027 | Kicker Pulsers for Recycler Nova Upgrades | 3324 |
|
||
Funding: Fermilab is operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy. An upgrade of the Recycler injection kicker system required a faster rise time pulser. This system required a field rise and fall time of < 57 ns and a field flattop of 1.6 μs. This paper describes the variety of improvements made over the years that have resulted in this latest thyratron pulser. The effects of the trigger, the reservoir and the load impedance on delay and rise time will be discussed. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-WEPTY027 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |