Author: Funakoshi, Y.
Paper Title Page
MOPHA054 Interaction Point Orbit Feedback System at SuperKEKB 921
 
  • Y. Funakoshi, H. Fukuma, T. Kawamoto, M. Masuzawa, T. Oki, S. Uehara, H. Yamaoka
    KEK, Ibaraki, Japan
  • S.D. Anderson, S.M. Gierman, M. Kosovsky, J.T. Seeman, C.M. Spencer, M.K. Sullivan, O. Turgut, U. Wienands
    SLAC, Menlo Park, California, USA
  • P. Bambade, D. El Khechen, D. Jehanno, V. Kubytskyi, C. Rimbault
    LAL, Orsay, France
 
  In order to maintain an optimum beam collision condition in a double ring collider such as SuperKEKB it is essential to have an orbit feedback system at the interaction point (IP). We have designed such a system based on experiences at KEKB and PEP-II. For the vertical offset and crossing angle, we will rely on the system based on the beam orbit measurement similar to that used at KEKB. For the horizontal offset, however, we will utilize the dithering system which was successfully used at PEP-II, because the horizontal beam-beam kick is very weak with the "nano-beam scheme". Some hardware devices have been already fabricated and others are in preparation. The present status of the development is reported.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-MOPHA054  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUYB1 Progress of SuperKEKB 1291
 
  • T. Miura, T. Abe, T. Adachi, K. Akai, M. Akemoto, A. Akiyama, D.A. Arakawa, Y. Arakida, Y. Arimoto, M. Arinaga, K. Ebihara, K. Egawa, A. Enomoto, J.W. Flanagan, S. Fukuda, H. Fukuma, Y. Funakoshi, K. Furukawa, T. Furuya, K. Hara, T. Higo, H. Hisamatsu, H. Honma, T. Honma, R. Ichimiya, N. Iida, H. Iinuma, H. Ikeda, M. Ikeda, T. Ishibashi, H. Ishii, M. Iwasaki, A. Kabe, T. Kageyama, H. Kaji, K. Kakihara, S. Kamada, T. Kamitani, S. Kanaeda, K. Kanazawa, H. Katagiri, S. Kato, S. Kazama, M. Kikuchi, T. Kobayashi, H. Koiso, Y. Kojima, M. Kurashina, K. Marutsuka, M. Masuzawa, S. Matsumoto, T. Matsumoto, H. Matsushita, S. Michizono, K. Mikawa, T. Mimashi, F. Miyahara, K. Mori, T. Mori, A. Morita, Y. Morita, H. Nakai, H. Nakajima, T.T. Nakamura, K. Nakanishi, K. Nakao, H. Nakayama, T. Natsui, M. Nishiwaki, J.-I. Odagiri, Y. Ogawa, K. Ohmi, Y. Ohnishi, S. Ohsawa, Y. Ohsawa, N. Ohuchi, K. Oide, T. Oki, M. Ono, H. Sakai, Y. Sakamoto, S. Sasaki, M. Sato, M. Satoh, K. Shibata, T. Shidara, M. Shirai, A. Shirakawa, M. Suetake, Y. Suetsugu, R. Sugahara, H. Sugimoto, T. Suwada, S. Takasaki, T. Takatomi, T. Takenaka, Y. Takeuchi, M. Tanaka, M. Tawada, S. Terui, M. Tobiyama, N. Tokuda, K. Tsuchiya, X. Wang, K. Watanabe, H. Yamaoka, Y. Yano, K. Yokoyama, Ma. Yoshida, M. Yoshida, S.I. Yoshimoto, K. Yoshino, R. Zhang, D. Zhou, X. Zhou, Z.G. Zong
    KEK, Ibaraki, Japan
  • D. Satoh
    TIT, Tokyo, Japan
 
  This presentation will cover the status of the installation and the injector commissioning status of SuperKEKB. The IR optics and design with very low β* of less than 1 mm will be discussed.  
slides icon Slides TUYB1 [6.588 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUYB1  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPTY008 Commissioning Status and Plan of SuperKEKB Injector Linac 2013
 
  • M. Satoh, M. Akemoto, D.A. Arakawa, Y. Arakida, A. Enomoto, Y. Enomoto, S. Fukuda, Y. Funakoshi, K. Furukawa, T. Higo, H. Honma, N. Iida, M. Ikeda, H. Iwase, H. Kaji, K. Kakihara, T. Kamitani, H. Katagiri, S. Kazama, M. Kikuchi, H. Koiso, M. Kurashina, S. Matsumoto, T. Matsumoto, H. Matsushita, S. Michizono, K. Mikawa, T. Mimashi, T. Miura, F. Miyahara, T. Mori, A. Morita, H. Nakajima, K. Nakao, T. Natsui, Y. Ogawa, Y. Ohnishi, S. Ohsawa, Y. Seimiya, T. Shidara, A. Shirakawa, M. Suetake, H. Sugimoto, T. Suwada, T. Takenaka, M. Tanaka, M. Tawada, Y. Yano, K. Yokoyama, M. Yoshida, R. Zhang, X. Zhou
    KEK, Ibaraki, Japan
  • D. Satoh
    TIT, Tokyo, Japan
 
  Toward SuperKEKB project, the injector linac upgrade is ongoing at KEK in order to deliver the low emittance electron/positron beams with the high intensity and small emittance. In the September of 2013, the injector linac commissioning has started. In this presentation, we will describe the commissioning status and plan of SuperKEKB injector linac.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPTY008  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPWI006 Dither Coils for the SuperKEKB Fast Collision Feedback System 3500
 
  • U. Wienands, S.D. Anderson, S.M. Gierman, M. Kosovsky, C.M. Spencer, M.K. Sullivan
    SLAC, Menlo Park, California, USA
  • Y. Funakoshi, M. Masuzawa, T. Oki
    KEK, Ibaraki, Japan
 
  Funding: Work supported in part by US DOE and in part by the US-Japan collaboration agreement.
The collision feedback system for the SuperKEKB electron-positron collider at KEK will employ a dither feedback with a roughly 100 Hz excitation frequency to generate a signal proportional to the offset of the two beams. The excitation will be provided by a local bump across the interaction point (IP) that is generated by a set of eight air-core solid-wire magnet coil assemblies, each of which provides a horizontal and/or vertical deflection of the beam, to be installed around the vacuum system of the SuperKEKB Low Energy Ring. The design of the coils was challenging as large antechambers had to be accommodated and a 0.1% relative field uniformity across a good-field region of ±1 cm was aimed for, while keeping reasonable dimensions of the coils. This led to non-symmetric, non-flat designs of the coils. The paper describes the magnetic design and the method used to calculate the magnetic field of the coils, the mechanical design and the field measurement results. Tracking in the lattice model has indicated acceptable performance.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-WEPWI006  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)