Paper |
Title |
Page |
TUPMA050 |
NSLS-II Injector Commissioning and Initial Operation |
1944 |
|
- E.B. Blum, B. Bacha, G. Bassi, J. Bengtsson, A. Blednykh, S. Buda, W.X. Cheng, J. Choi, J. Cupolo, R. D'Alsace, M.A. Davidsaver, J.H. De Long, L. Doom, D.J. Durfee, R.P. Fliller, M. Fulkerson, G. Ganetis, F. Gao, C. Gardner, W. Guo, R. Heese, Y. Hidaka, Y. Hu, M.P. Johanson, B.N. Kosciuk, S. Kowalski, S.L. Kramer, S. Krinsky, Y. Li, W. Louie, M.A. Maggipinto, P. Marino, J. Mead, J. Oliva, D. Padrazo, K. Pedersen, B. Podobedov, R.S. Rainer, J. Rose, M. Santana, S. Seletskiy, T.V. Shaftan, O. Singh, P. Singh, V.V. Smaluk, R.M. Smith, T. Summers, J. Tagger, Y. Tian, W.H. Wahl, G.M. Wang, G.J. Weiner, F.J. Willeke, L. Yang, X. Yang, E. Zeitler, E. Zitvogel, P. Zuhoski
BNL, Upton, Long Island, New York, USA
- A. Akimov, P.B. Cheblakov, I.N. Churkin, A.A. Derbenev, S.M. Gurov, S.E. Karnaev, V.A. Kiselev, A.A. Korepanov, E.B. Levichev, S.V. Sinyatkin, A.N. Zhuravlev
BINP SB RAS, Novosibirsk, Russia
|
|
|
The injector for the National Synchrotron Light Source II storage ring consists of a 3 GeV booster synchrotron and a 200 MeV S-band linac. The linac was designed to produce either a single bunch with a charge of 0.5 nC of electrons or a train of bunches up to 300 ns long containing a total charge of 15 nC. The booster was designed to accelerate up to 15 nC each cycle. Linac commissioning was completed in April 2012. Booster commissioning was started in November 2013 and completed in March 2014. All of the significant design goals were satisfied including beam emittance, energy spread, and transport efficiency. While the maximum booster charge accelerated was only 10 nC this has proven to be more than sufficient for storage ring commissioning. The injector has operated reliably during storage ring operation since then. Results will be presented showing measurements of injector operating parameters achieved during commissioning and initial operation. Operating experience and reliability during the first year of NSLS-II operation will be discussed.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-TUPMA050
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPMA053 |
Experience with First Turns Commissioning in NSLS-II Storage Ring |
1950 |
|
- S. Seletskiy, G. Bassi, J. Bengtsson, A. Blednykh, E.B. Blum, W.X. Cheng, J. Choi, R.P. Fliller, W. Guo, R. Heese, Y. Hidaka, S.L. Kramer, Y. Li, B. Podobedov, T.V. Shaftan, G.M. Wang, F.J. Willeke, L. Yang, X. Yang
BNL, Upton, Long Island, New York, USA
|
|
|
In this paper we describe our experience with commissioning of the first turns in the NSLS-II storage ring. We discuss the problems that we encountered and show how applying a dedicated first turns commissioning software allowed us to diagnose and resolve these problems.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-TUPMA053
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPMA055 |
Analysis of Possible Beam Losses in the NSLS II Storage Ring |
1956 |
|
- S. Seletskiy, R.P. Fliller, W. Guo, S.L. Kramer, Y. Li, B. Podobedov, T.V. Shaftan, W.H. Wahl, F.J. Willeke
BNL, Upton, Long Island, New York, USA
|
|
|
The NSLS-II accelerators are installed within radiation shielding walls that are designed to attenuate the radiation generated from an assumed beam loss power to a level of <0.5mrem/h at the outer surface of the bulk shield walls. Any operational losses greater than specified level are expected to be addressed by installing supplemental shielding near the loss point in order to attenuate the radiation outside the shield wall to the design level. In this paper we report the analysis of the electron beam mis-steering in the NSLS-II storage ring for the determination of supplementary shielding.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-TUPMA055
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPMA056 |
Analysis of Possible Beam Losses in the NSLS II BSR Transfer Line |
1959 |
|
- S. Seletskiy, R.P. Fliller, W. Guo, S.L. Kramer, Y. Li, B. Podobedov, T.V. Shaftan, W.H. Wahl, F.J. Willeke
BNL, Upton, Long Island, New York, USA
|
|
|
The NSLS-II accelerators are installed within 0.8 – 1 m thick radiation shielding walls. The safety considerations require attenuating the radiation generated from possible electron beam losses to a level of <0.5mrem/h at the outer surface of the bulk shield walls. Any operational losses greater than specified level shall be addressed by installing supplemental shielding near the loss point. In this paper we discuss simulation studies that identified potential beam loss locations. Results of these studies were used for identification of imposed radiation risks and for specification of the supplemental shielding design necessary to mitigate those risks.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-TUPMA056
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPHA007 |
NSLS II Booster Extended Integration Test |
1977 |
|
- G.M. Wang, B. Bacha, A. Blednykh, E.B. Blum, W.X. Cheng, J. Choi, L.R. Dalesio, M.A. Davidsaver, J.H. De Long, R.P. Fliller, G. Ganetis, W. Guo, K. Ha, Y. Hu, W. Louie, T.V. Shaftan, G. Shen, O. Singh, Y. Tian, F.J. Willeke, L. Yang, X. Yang
BNL, Upton, Long Island, New York, USA
- P.B. Cheblakov, A.A. Derbenev, A.I. Erokhin, S.E. Karnaev, S.V. Sinyatkin
BINP SB RAS, Novosibirsk, Russia
- V.V. Smaluk
DLS, Oxfordshire, United Kingdom
|
|
|
The National Synchrotron Light Source II (NSLS-II) is a state of the art 3 GeV third generation light source at Brookhaven National Laboratory. While the installation activities in the booster-synchrotron are nearly completed and waiting for the authorization to start the booster commissioning, the injector and accelerator physics group have engaged into the Integrated Testing phase. We did the booster commissioning with simulated beam signals, called extended integrated testing (EIT) to prepare for the booster ring commissioning. It is to make sure the device function along with utilities, timing system and control system, to calibrate diagnostics system, debug High Level Applications, test and optimize all the operation screens to reduce the potential problems during booster commissioning with beam.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-TUPHA007
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPHA008 |
NSLS-II Injector High Level Application Tools |
1980 |
|
- G.M. Wang, E.B. Blum, R.P. Fliller, Y. Hu, T.V. Shaftan, X. Yang
BNL, Upton, Long Island, New York, USA
|
|
|
The National Synchrotron Light Source II (NSLS-II) is a state of the art 3 GeV third generation light source at Brookhaven National Laboratory. The injection system consists of a 200 MeV linac, a 3 GeV booster synchrotron and transfer lines in connection of linac, booster and storage ring. The transfer lines, designed and built from BNL, are equipped with sufficient diagnostics to commission to characterize the beam parameters from linac and booster. In the paper, we summarized the high level applications tools, beam emittance, energy and energy spread measurement, developed during the injector commissioning.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-TUPHA008
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPHA010 |
Design of the NSLS-II Top Off Safety System |
1986 |
|
- R.P. Fliller, L. Doom, G. Ganetis, C. Hetzel, P.K. Job, Y. Li, T.V. Shaftan, S.K. Sharma, O. Singh, G.M. Wang, Z. Xia
BNL, Upton, Long Island, New York, USA
|
|
|
The NSLS-II accelerators finished commissioning in the fall of 2014, with beamline commissioning underway. Part of the design for the NSLS-II is to operate in top off mode. The Top Off Safety System (TOSS) is presently under design. In this report we discuss the Top Off Safety System design and implementation, along with the necessary tracking results and radiological calculations.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-TUPHA010
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|