Paper | Title | Page |
---|---|---|
MOPJE067 | Applications of PLACET2 to the CTF3 Combiner Ring | 462 |
|
||
The CTF3 Combiner Ring (CR) is an isochronous ring that employs RF-injection to combine multiple bunch trains (up to five) into a single one with higher bunch frequency. The length of the CR plays a critical role in obtaining the correct structure of the recombined train. PLACET2: the new recirculating version of the code PLACET is particularly suited to simulate the operational scenario. In order to validate this code, three different case studies have been considered: ring-length variations due to energy detuning, fast-beam decoherence due to uncorrected chromatic effects and vertical instabilities due to bunch-to-bunch wakefield effects. The first two effects have been measured during the last run and the predictions have been validated. The instability has been compared with previous studies. The results are presented and discussed. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-MOPJE067 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPTY004 | Wakefield Monitor Experiments with X-Band Accelerating Structures | 947 |
|
||
The accelerating structures for CLIC must be aligned with a precision of a few um with respect to the beam trajectory in order to mitigate emittance growth due to transverse wake fields. We report on first results from wake field monitor tests in an X-band structure, with a probe beam at the CLIC Test Facility. The monitors are currently installed in the CLIC Two-Beam Module. In order to fully demonstrate the feasibility of using wakefield monitors for CLIC, the precision of the monitors must be verified using a probe beam while simultaneously filling the structure with high power rf used to drive the accelerating mode. We outline plans to perform such a demonstration in the CLIC Test Facility. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-MOPTY004 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPWI001 | First Results From Beam Tests of the CLIC Drive Beam Phase Feedforward Prototype at CTF3 | 1139 |
|
||
Funding: Work supported by the European Commission under the FP7 Research Infrastructures project Eu-CARD, grant agreement no. 227579. In the CLIC two beam acceleration scheme 100 MV/m normal conducting cavities are fed with RF power extracted from a secondary high power but low energy drive beam. To ensure the efficiency and luminosity performance of CLIC the phase synchronisation between the high energy main beam and the drive beam must be maintained to within 0.2 degrees of 12 GHz. To reduce the drive beam phase jitter to this level a low-latency drive beam phase feedforward correction with bandwidth above 17.5 MHz is required. A prototype of this system has been installed at the CLIC test facility CTF3 to prove its feasibility, in particular the challenges of high bandwidth, high power and low latency hardware. The final commissioning and first results from operation of the complete phase feedforward system are presented here. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-MOPWI001 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |