Paper |
Title |
Page |
TUPTY050 |
Considerations for the Beam Dump System of a 100 TeV Centre-of-mass FCC hh Collider |
2132 |
|
- T. Kramer, M.G. Atanasov, M.J. Barnes, W. Bartmann, J. Borburgh, E. Carlier, F. Cerutti, L. Ducimetière, B. Goddard, A. Lechner, R. Losito, G.E. Steele, L.S. Stoel, J.A. Uythoven, F.M. Velotti
CERN, Geneva, Switzerland
|
|
|
A 100 TeV centre-of-mass energy frontier proton collider in a new tunnel of 80–100 km circumference is a central part of CERN’s Future Circular Colliders (FCC) design study. One of the major challenges for such a machine will be the beam dump system, which for each ring will have to reliably abort proton beams with stored energies in the range of 8 Gigajoule, more than an order of magnitude higher than planned for HL-LHC. The transverse proton beam energy densities are even more extreme, a factor of 100 above that of the presently operating LHC. The requirements for the beam dump subsystems are outlined, and the present technological limitations are described. First concepts for the beam dump system are presented and the feasibility is discussed, highlighting in particular the areas in which major technological progress will be needed. The potential implications on the overall machine and other key subsystems are described, including constraints on filling patterns, interlocking, beam intercepting devices and insertion design.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-TUPTY050
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPMN067 |
Upgrade of the TCDQ Diluters for the LHC Beam Dump System |
3079 |
|
- M.G. Atanasov, W. Bartmann, J. Borburgh, C. Boucly, C. Bracco, L. Gentini, B. Moles, W.J.M. Weterings
CERN, Geneva, Switzerland
|
|
|
The TCDQ diluters are installed as part of the LHC beam dump system to protect the Q4 quadrupole and other downstream elements during a beam dump that is not synchronised with the abort gap, or in case of erratic firing of the extraction kickers. These diluter elements installed during Run 1 were compatible with beam up to 60 % of the nominal intensity, which was insufficient for the second run of the LHC. This paper describes the requirements for the upgrade done during the First Long Shutdown (LS1), to make the TCDQ compatible with the full 7 TeV LHC beam at intensities required for the future runs of the machine. Subsequently the mechanical design changes, implementation and commissioning of the TCDQ are reported.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-WEPMN067
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPMN068 |
Upgrade of the CERN SPS Extraction Protection Elements TPS |
3083 |
|
- J. Borburgh, B. Balhan, M.J. Barnes, C. Baud, M.A. Fraser, V. Kain, F.L. Maciariello, G.E. Steele, F.M. Velotti
CERN, Geneva, Switzerland
|
|
|
In 2006 the protection devices upstream of the septa in both extraction channels of the CERN SPS to the LHC were installed. Since then, new beam parameters have been proposed for the SPS beam towards the LHC in the framework of the LIU project. The mechanical parameters and assumptions on which these protection devices presently have been based, need validation before the new upgraded versions can be designed and constructed. The paper describes the design assumptions for the present protection device and the testing program for the TPSG4 at HiRadMat to validate them. Finally the requirements and the options to upgrade both extraction protection elements in the SPS are described.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-WEPMN068
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPF082 |
Considerations on the Fast Pulsed Magnet Systems for the 2 GeV Beam Transfer from the CERN PSB to PS |
3876 |
|
- T. Kramer, J.L. Abelleira, W. Bartmann, J. Borburgh, L. Ducimetière, L.M.C. Feliciano, B. Goddard, L. Sermeus
CERN, Geneva, Switzerland
|
|
|
Within the scope of the LIU project the CERN PS Booster to PS beam transfer will be modified to match the requirements for the future 2 GeV proton beam energy upgrade. The paper describes considerations on the PSB extraction and recombination kickers as well as on the injection kicker(s) into the PS. Different schemes of an injection into the PS have been outlined in the past and are reviewed under the aspect of individual transfer kicker rise and fall time performances. Recent measurements on the recombination kickers are presented and subsequently homogenous rise and fall time requirements in the whole PSB to PS transfer chain are presented. The baseline option for the PS injection kicker(s) is outlined and compared to the previously presented concepts.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-THPF082
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPF090 |
Status and Plans for the Upgrade of the CERN PS Booster |
3905 |
|
- K. Hanke, D. Aguglia, M.E. Angoletta, W. Bartmann, C. Bedel, E. Benedetto, S. Bertolasi, C. Bertone, J. Betz, T.W. Birtwistle, A. Blas, J. Borburgh, C. Bracco, A.C. Butterworth, E. Carlier, S. Chemli, P. Dahlen, A. Dallocchio, G.P. Di Giovanni, T. Dobers, A. Findlay, R. Froeschl, A. Funken, S. Gabourin, J.L. Grenard, D. Grenier, J. Hansen, D. Hay, J.-M. Lacroix, P. Le Roux, L.A. Lopez Hernandez, C. Martin, A. Masi, B. Mikulec, Y. Muttoni, A. Newborough, D. Nisbet, M.R. Obrecht, M.M. Paoluzzi, S. Pittet, B. Puccio, J. Tan, J. Vollaire, W.J.M. Weterings
CERN, Geneva, Switzerland
|
|
|
CERN’s Proton Synchrotron Booster (PSB) is undergoing a major upgrade program in the frame of the LHC Injectors Upgrade (LIU) project. During the first long LHC shutdown (LS1) some parts of the upgrade have already been implemented, and the machine has been successfully re-commissioned. More work is planned for the upcoming end-of-year technical stops, notably in 2016/17, while most of the upgrade is planned to take place during the second long LHC shutdown (LS2). We report on the upgrade items already completed and commissioned, the first Run 2 beam performance and give a status of the ongoing design and integration work.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-THPF090
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPF099 |
Upgrade of the SPS Ion Injection System |
3938 |
|
- J.A. Uythoven, J. Borburgh, E. Bravin, S. Burger, E. Carlier, J.-M. Cravero, L. Ducimetière, S.S. Gilardoni, B. Goddard, J. Hansen, E.B. Holzer, M. Hourican, T. Kramer, F.L. Maciariello, D. Manglunki, F.-X. Nuiry, A. Perillo Marcone, G.E. Steele, F.M. Velotti, H. Vincke
CERN, Geneva, Switzerland
|
|
|
As part of the LHC Injectors Upgrade Project (LIU) the injection system into the SPS will be upgraded for the use with ions. The changes will include the addition of a Pulse Forming Line parallel to the existing PFN to power the kicker magnets MKP-S. With the PFL a reduced magnetic field rise time of 100 ns should be reached. The missing deflection strength will be given by two new septum magnets MSI-V, to be installed between the existing septum MSI and the kickers MKP-S. A dedicated ion dump will be installed downstream of the injection elements. The parameter lists of the elements and studies concerning emittance blow-up coming from the injection system are presented. The feasibility of the 100 ns kicker rise time and the small ripple of the septum power converter are presented. Material studies of the ion dump are presented together with the radiation impact.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-THPF099
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|