NSLS-II Injector Commissioning and Initial Operation |
1944 |
|
- E.B. Blum, B. Bacha, G. Bassi, J. Bengtsson, A. Blednykh, S. Buda, W.X. Cheng, J. Choi, J. Cupolo, R. D'Alsace, M.A. Davidsaver, J.H. De Long, L. Doom, D.J. Durfee, R.P. Fliller, M. Fulkerson, G. Ganetis, F. Gao, C. Gardner, W. Guo, R. Heese, Y. Hidaka, Y. Hu, M.P. Johanson, B.N. Kosciuk, S. Kowalski, S.L. Kramer, S. Krinsky, Y. Li, W. Louie, M.A. Maggipinto, P. Marino, J. Mead, J. Oliva, D. Padrazo, K. Pedersen, B. Podobedov, R.S. Rainer, J. Rose, M. Santana, S. Seletskiy, T.V. Shaftan, O. Singh, P. Singh, V.V. Smaluk, R.M. Smith, T. Summers, J. Tagger, Y. Tian, W.H. Wahl, G.M. Wang, G.J. Weiner, F.J. Willeke, L. Yang, X. Yang, E. Zeitler, E. Zitvogel, P. Zuhoski
BNL, Upton, Long Island, New York, USA
- A. Akimov, P.B. Cheblakov, I.N. Churkin, A.A. Derbenev, S.M. Gurov, S.E. Karnaev, V.A. Kiselev, A.A. Korepanov, E.B. Levichev, S.V. Sinyatkin, A.N. Zhuravlev
BINP SB RAS, Novosibirsk, Russia
|
|
|
The injector for the National Synchrotron Light Source II storage ring consists of a 3 GeV booster synchrotron and a 200 MeV S-band linac. The linac was designed to produce either a single bunch with a charge of 0.5 nC of electrons or a train of bunches up to 300 ns long containing a total charge of 15 nC. The booster was designed to accelerate up to 15 nC each cycle. Linac commissioning was completed in April 2012. Booster commissioning was started in November 2013 and completed in March 2014. All of the significant design goals were satisfied including beam emittance, energy spread, and transport efficiency. While the maximum booster charge accelerated was only 10 nC this has proven to be more than sufficient for storage ring commissioning. The injector has operated reliably during storage ring operation since then. Results will be presented showing measurements of injector operating parameters achieved during commissioning and initial operation. Operating experience and reliability during the first year of NSLS-II operation will be discussed.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-TUPMA050
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPMA053 |
Experience with First Turns Commissioning in NSLS-II Storage Ring |
1950 |
|
- S. Seletskiy, G. Bassi, J. Bengtsson, A. Blednykh, E.B. Blum, W.X. Cheng, J. Choi, R.P. Fliller, W. Guo, R. Heese, Y. Hidaka, S.L. Kramer, Y. Li, B. Podobedov, T.V. Shaftan, G.M. Wang, F.J. Willeke, L. Yang, X. Yang
BNL, Upton, Long Island, New York, USA
|
|
|
In this paper we describe our experience with commissioning of the first turns in the NSLS-II storage ring. We discuss the problems that we encountered and show how applying a dedicated first turns commissioning software allowed us to diagnose and resolve these problems.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-TUPMA053
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPHA006 |
NSLS-II Storage Ring Insertion Device and Front-End Commissioning |
1974 |
|
- G.M. Wang, C. Amundsen, G. Bassi, J. Bengtsson, A. Blednykh, E.B. Blum, W.X. Cheng, J. Choi, O.V. Chubar, T.M. Corwin, M.A. Davidsaver, L. Doom, W. Guo, D.A. Harder, P. He, Y. Hidaka, Y. Hu, P. Ilinski, C.A. Kitegi, S.L. Kramer, Y. Li, M. Musardo, D. Padrazo, B. Podobedov, K. Qian, R.S. Rainer, J. Rank, S. Seletskiy, T.V. Shaftan, S.K. Sharma, O. Singh, V. Smalyuk, R.M. Smith, T. Summers, T. Tanabe, F.J. Willeke, L. Yang, X. Yang, L.-H. Yu
BNL, Upton, Long Island, New York, USA
|
|
|
The National Synchrotron Light Source II (NSLS-II) is a state of the art 3 GeV third generation light source at Brookhaven National Laboratory. In the spring 2014, the storage ring was commissioning up to 50 mA without insertion device. In the fall, the project beamlines, includes seven insertion devices on six ID ports were commissioned within two and a half months. These beamlines consist of IXS, HXN, CSX-1, CSX-2, CHX, SRX, and XPD-1, from the radiation sources elliptically polarizing undulator (EPU), damping wiggler (DW) and in vacuum undulator (IVU) to cover the VUV through the very hard x-ray range. In this paper, a number of commissioning and operation experiences are discussed here, such as injection, lifetime, ID residual field and compensation, source point stability, beam alignment and tools for control, monitor and beam protection.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-TUPHA006
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|