TUPTY061 | Combined Operation and Staging Scenarios for the FCC-ee Lepton Collider | 2169 |
|
||
FCC-ee is a proposed high-energy electron positron circular collider that would initially occupy the 100-km FCC tunnel that will eventually house the 100 TeV FCC-hh hadron collider. The parameter range for the e+/e− collider is large, operating at a cm energy from 90 GeV (Z-pole) to 350 GeV (t-tbar production) with the maximum beam current ranging from 1.5 A to 6 mA for each beam, corresponding to a synchrotron radiation power of 50 MW and a radiative energy loss varying from ~30 MeV/turn to ~7500 MeV/turn. This presents challenges for the rf system due to the varying rf voltage requirements and beam loading conditions. In this paper we present a possible gradual evolution of the FCC-ee complex by step-wise expansion, and possibly reconfiguration, of the superconducting RF system. The performance attainable at each step is discussed, along with the possible advantages and drawbacks. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPTY061 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPTY062 | FCC-hh Hadron Collider - Parameter Scenarios and Staging Options | 2173 |
|
||
FCC-hh is a proposed future energy-frontier hadron collider, based on dipole magnets with a field around 16 T installed in a new tunnel with a circumference of about 100 km, which would provide proton collisions at a centre-of-mass energy of 100 TeV, as well as heavy-ion collisions at the equivalent energy. The FCC-hh should deliver a high integrated proton-proton luminosity at the level of several 100 fb-1 per year, or more. The challenges for operating FCC-hh with high beam current and at high luminosity include the heat load from synchrotron radiation in a cold environment, the radiation from collision debris around the interaction region, and machine protection. In this paper, starting from the FCC-hh design baseline parameters we explore different approaches for increasing the integrated luminosity, and discuss the impact of key individual parameters, such as the turnaround time. We also present some injector considerations and options for early hadron-collider operation. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPTY062 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPF001 | Tomography of Horizontal Phase Space Distribution of a Slow Extracted Proton Beam in the MedAustron High Energy Beam Transfer Line | 3673 |
|
||
Funding: EBG MedAustron Marie Curie Strasse 5 A-2700 Wiener Neustadt www.medaustron.at MedAustron is a synchrotron based hadron therapy and research center in Wiener Neustadt, Austria, which currently is under commissioning for the first patient treatment. The High Energy Beam Transfer Line (HEBT) consists of mul- tiple functional modules amongst which the phase-shifter- stepper PSS* is the most important module located where the dispersion from the synchrotron is zero and upstream of the switching magnet to the first irradiation room. The PSS is used to control the beam size for the downstream modules and for this scope rotates the beam in horizontal phase space by adjusting the phase advance. This functionality is used in this study to measure beam profiles for multiple phase space angles which act as input for a tomographic reconstruction. Simulation and measurement results are presented. * M. Benedikt et al, A new concept for the control of a slow-extracted beam in a line with rotational optics, Nuclear Instruments and Methods in Physics Research Section A, Vol 430, Issues 2–3, 1999 |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-THPF001 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPF094 | Possible Reuse of the LHC as a 3.3 TeV High Energy Booster for Hadron Injection into the FCC-hh Collider | 3919 |
|
||
One option for the injector into a 100 TeV centre-of-mass energy frontier proton collider (FCC-hh) in a new tunnel of 80–100 km circumference is to reuse a suitably modified LHC as 3.3 TeV High Energy Booster (HEB). The changes that would be required to the existing LHC insertions are described, including the types and numbers of new magnets and circuits. The limitations on the maximum LHC ramp rate and minimum cycle time discussed. The key question of the minimum FCC filling time achievable with technically possible upgrades is examined, together with the issues of decommissioning for the elements which would need to be removed from the machine. The potential performance reach of the modified LHC as 3.3 TeV HEB is quantified, and implications for FCC-hh discussed. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-THPF094 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |