01 Circular and Linear Colliders
A08 Linear Accelerators
Paper Title Page
MOPRO001 Upgrade Status of Injector LINAC for SuperKEKB 59
 
  • T. Miura, M. Akemoto, D.A. Arakawa, Y. Arakida, A. Enomoto, S. Fukuda, Y. Funakoshi, K. Furukawa, T. Higo, H. Honma, R. Ichimiya, N. Iida, M. Ikeda, E. Kadokura, H. Kaji, K. Kakihara, T. Kamitani, H. Katagiri, M. Kurashina, S. Matsumoto, T. Matsumoto, H. Matsushita, S. Michizono, K. Mikawa, F. Miyahara, H. Nakajima, K. Nakao, T. Natsui, Y. Ogawa, Y. Ohnishi, S. Ohsawa, F. Qiu, M. Satoh, T. Shidara, A. Shirakawa, H. Sugimoto, T. Suwada, T. Takenaka, M. Tanaka, Y. Yano, K. Yokoyama, M. Yoshida, L. Zang, X. Zhou
    KEK, Ibaraki, Japan
  • D. Satoh
    TIT, Tokyo, Japan
 
  The SuperKEKB collider is under construction to achieve 40-times higher luminosity than that of previous KEKB collider. The injector LINAC should provide high-intensity and low-emittance beams of 7-GeV electron and 4-GeV positron for SuperKEKB based on a nano-beam scheme. A photocathode RF-gun for low emittance electron beam has been already installed and the commissioning has started. The construction of positron capture section using a flux-concentrator and the dumping ring for low emittance positron beam is in progress. The simultaneous top-up injections to four storage-rings including photon factories is also required. In the upstream of dumping ring, the compatible optics between positron and electron has been designed. In the downstream of dumping ring, RF phase, focusing, and steering magnets will be switched by pulse to pulse against each beam-mode for optimising beam-transportation. This paper describes recent upgrade status toward the SuperKEKB.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-MOPRO001  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPRO002 The Momentum Distribution of the Decelerated Drive Beam in CLIC and in the Two-beam Test Stand at CTF3 62
 
  • Ch. Borgmann, M. Jacewicz, J. Ögren, M. Olvegård, R.J.M.Y. Ruber, V.G. Ziemann
    Uppsala University, Uppsala, Sweden
 
  We present analytical calculations of the momentum spectrum of the drive beam in CLIC and the CLIC Test Facility CTF3 after part of its kinetic energy is converted to microwaves for the acceleration of the main beam. The resulting expressions are used to determine parameters of the power conversion process in the Power Extraction Structure (PETS) installed in the Two-beam Test Stand in CTF3.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-MOPRO002  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPRO003 Towards Stable Acceleration in Linacs 65
 
  • A. Dubrovskiy
    Private Address, Geneve, Switzerland
 
  Ultra-stable and -reproducible high-energy particle beams with short bunches are needed in novel linear accelerators and, in particular, in the Compact Linear Collider CLIC. A passive beam phase stabilization system based on a bunch compression with a negative transfer matrix element R56 and acceleration at a positive off-crest phase is proposed. The motivation and expected advantages of the proposed scheme are outlined.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-MOPRO003  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEOCA02 Recent Results from CTF3 Two Beam Test Stand 1880
 
  • W. Farabolini, F. Peauger
    CEA/DSM/IRFU, France
  • Ch. Borgmann, J. Ögren, R.J.M.Y. Ruber
    Uppsala University, Uppsala, Sweden
  • R. Corsini, D. Gamba, A. Grudiev, M.A. Khan, S. Mazzoni, J.L. Navarro Quirante, R. Pan, J.R. Towler, N. Vitoratou, K. Yaqub
    CERN, Geneva, Switzerland
 
  From mid-2012, the Two Beam Test Stand (TBTS) in the CTF3 Experimental Facility is hosting 2 high gradient accelerating structures powered by a single power extraction and transfer structure in a scheme very close to the CLIC basic cell. We report here about the results obtained with this configuration as: energy gain and energy spread in relation with RF phases and power, octupolar transverse beam effects compared with modeling predictions, breakdown rate and breakdown locations within the structures. These structures are the first to be fitted with Wake Field Monitors (WFM) that have been extensively tested and used to further improve the structures alignment on the beam line. These results show the unique capabilities of this test stand to conduct experiments with real beams.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-WEOCA02  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)