Author: Wenninger, J.
Paper Title Page
MOXAA01 Challenges for Highest Energy Circular Colliders 1
 
  • F. Zimmermann, M. Benedikt, D. Schulte, J. Wenninger
    CERN, Geneva, Switzerland
 
  A new tunnel of 80-100 km circumference could host a 100 TeV centre-of-mass energy-frontier proton collider (FCC-hh/VHE-LHC), with a circular lepton collider (FCC-ee/TLEP) as potential intermediate step, and a lepton-hadron collider (FCC-he) as additional option. FCC-ee, operating at four different energies for precision physics of the Z, W, and Higgs boson and the top quark, represents a significant push in terms of technology and design parameters. Pertinent R&D efforts include the RF system, top-up injection scheme, optics design for arcs and final focus, effects of beamstrahlung, beam polarization, energy calibration, and power consumption. FCC-hh faces other challenges, such as high-field magnet design, machine protection and effective handling of large synchrotron radiation power in a superconducting machine. All these issues are being addressed by a global FCC collaboration. A parallel design study in China prepares for a similar, but smaller collider, called CepC/SppC.  
slides icon Slides MOXAA01 [27.493 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-MOXAA01  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOOCB01 Beam-induced Quench Tests of LHC Magnets 52
 
  • M. Sapinski, B. Auchmann, T. Bär, W. Bartmann, M. Bednarek, S. Bozyigit, C. Bracco, R. Bruce, F. Cerutti, V. Chetvertkova, K. Dahlerup-Petersen, B. Dehning, E. Effinger, J. Emery, A. Guerrero, E.B. Holzer, W. Höfle, A. Lechner, A. Priebe, S. Redaelli, B. Salvachua, R. Schmidt, N.V. Shetty, A.P. Siemko, E. Skordis, M. Solfaroli Camillocci, J. Steckert, J.A. Uythoven, D. Valuch, A.P. Verweij, J. Wenninger, D. Wollmann, M. Zerlauth, E.N. del Busto
    CERN, Geneva, Switzerland
 
  At the end of the LHC Run1 a 48-hour quench-test campaign took place to investigate the quench levels of superconducting magnets for loss durations from nanoseconds to tens of seconds. The longitudinal losses produced extended from one meter to hundreds of meters and the number of lost protons varied from 108 to 1013. The results of these and other, previously conducted quench experiments, allow the quench levels of several types of LHC magnets under various loss conditions to be assessed. The quench levels are expected to limit LHC performance in the case of steady-state losses in the interaction regions and also in the case of fast losses initiated by dust particles all around the ring. It is therefore required to accurately adjust beam loss abort thresholds in order to maximize the operation time. A detailed discussion of these quench test results and a proposal for additional tests after the LHC restart is presented.  
slides icon Slides MOOCB01 [2.737 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-MOOCB01  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPRO043 Handling 1 MW Losses with the LHC Collimation System 174
 
  • B. Salvachua, R. Bruce, F. Carra, M. Cauchi, E.B. Holzer, W. Höfle, D. Jacquet, L. Lari, D. Mirarchi, E. Nebot Del Busto, S. Redaelli, A. Rossi, M. Sapinski, R. Schmidt, G. Valentino, D. Valuch, J. Wenninger, D. Wollmann, M. Zerlauth
    CERN, Geneva, Switzerland
  • M. Cauchi
    UoM, Msida, Malta
  • L. Lari
    IFIC, Valencia, Spain
 
  Funding: Research supported by EU FP7 HiLumi LHC (Grant agree. 284404)
The LHC superconducting magnets in the dispersion suppressor of IR7 are the most exposed to beam losses leaking from the betatron collimation system and represent the main limitation for the halo cleaning. In 2013, quench tests were performed at 4 TeV to improve the quench limit estimates, which determine the maximum allowed beam loss rate for a given collimation cleaning. The main goal of the collimation quench test was to try to quench the magnets by increasing losses at the collimators. Losses of up to 1 MW over a few seconds were generated by blowing up the beam, achieving total losses of about 5.8 MJ. These controlled losses exceeded by a factor 2 the collimation design value, and the magnets did not quench.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-MOPRO043  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPRI100 Investigations of SPS Orbit Drifts 852
 
  • L.N. Drøsdal, C. Bracco, K. Cornelis, B. Goddard, V. Kain, M. Meddahi, J. Wenninger
    CERN, Geneva, Switzerland
  • E. Gianfelice-Wendt
    Fermilab, Batavia, Illinois, USA
 
  The LHC is filled from the last pre-injector, the Super Proton Synchrotron (SPS), via two 3 km long transfer lines, TI 2 and TI 8. Over the LHC injection processes, a drift of the beam trajectories has been observed in TI 2 and TI 8, requiring regular correction of the trajectories, in order to ensure clean injection into the LHC. Investigations of the trajectory variations in the transfer lines showed that the main source of short term trajectory drifts are current variations of the SPS extraction septa (MSE). The stability of the power converters has been improved, but the variations are still present and further improvements are being investigated. The stability over a longer period of time cannot be explained by this source alone. The analysis of trajectory variations shows that there are also slow variations in the SPS closed orbit at extraction. A set of SPS orbit measurements has been saved and analysed. These observations will be used together with simulations and observed field errors to locate the second source of variations.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-MOPRI100  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPRO016 Machine Protection Challenges for HL-LHC 1039
 
  • R. Schmidt, T. Bär, J. Wenninger, D. Wollmann, M. Zerlauth
    CERN, Geneva, Switzerland
 
  LHC operation requires the flawless functioning of the machine protection systems. The energy stored in the beam was progressively increased beyond the 140 MJ range at the end of 2012 at 4 TeV/c. The further increase to 364 MJ expected for 2015 at 6.5 TeV/c should be possible with the existing protection systems. For HL-LHC, additional failure modes are considered. The stored beam energy will increase by another factor of two with respect to nominal and a factor of five more than experienced so far. The maximum beta function will increase. It is planned to install crab cavities in the LHC. With crab cavities, sudden voltage decays within 100 us after e.g. cavity quenches lead to large beam oscillations. Tracking simulations predict trajectory distortions of up to 1.5 σ in the first turn after a sudden drop of the deflecting voltage in a single cavity within 3 turns. The energy of several MJ stored in halo protons that could hit the collimator in case of such events is far above damage level, even if the collimator jaws are made of robust material. In this paper we discuss the challenges for machine protection in the HL-LHC era and possible mitigation strategies.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-TUPRO016  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPRO022 Implementation of Luminosity Leveling by Betatron Function Adjustment at the LHC Interaction Points 1058
 
  • J. Wenninger, A.A. Gorzawski
    CERN, Geneva, Switzerland
 
  Growing expectations for integrated luminosity during upcoming LHC runs introduce new challenges for LHC beam operation in the scope of online luminosity control. Because some LHC experiments are limited in the maximum event rates, their luminosity is leveled to a constant value. Various techniques may be used for luminosity leveling, changing the betatron function at the interaction point is one of them. This paper explains the main operational requirements of a betatron function leveling scheme for the upcoming LHC run. Issues concerning the beam optics, orbits and collimator settings are discussed. The proposed architecture for control system integration will be discussed. A few operational scenarios with different beam configurations foreseen for the next LHC run will be presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-TUPRO022  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPRO068 SPS Beam Steering for LHC Extraction 2106
 
  • E. Gianfelice-Wendt
    Fermilab, Batavia, Illinois, USA
  • H. Bartosik, K. Cornelis, L.N. Drøsdal, B. Goddard, V. Kain, M. Meddahi, Y. Papaphilippou, J. Wenninger
    CERN, Geneva, Switzerland
 
  The CERN Super Proton Synchrotron accelerates beams for the Large Hadron Collider to 450 GeV. In addition it produces beams for fixed target facilities which adds complexity to the SPS operation. During the run 2012-2013 drifts of the extracted beam trajectories have been observed and lengthy optimizations in the transfer lines were performed to reduce particle losses in the LHC. The observed trajectory drifts are consistent with the measured SPS orbit drifts at extraction. While extensive studies are going on to understand, and possibly suppress, the source of such SPS orbit drifts the feasibility of an automatic beam steering towards a “golden” orbit at the extraction septa, by means of the interlocked correctors, is also being investigated. The challenges and constraints related to the implementation of such a correction in the SPS are described. Simulation results are presented and a possible operational steering strategy is proposed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-WEPRO068  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRO080 The FiDeL Model at 7 TeV 3069
 
  • N. Aquilina, M. Giovannozzi, P. Hagen, M. Lamont, A. Langner, E. Todesco, R. Tomás, J. Wenninger
    CERN, Geneva, Switzerland
  • N.J. Sammut
    University of Malta, Information and Communication Technology, Msida, Malta
 
  After the long shut down of 2013-2014, the LHC energy will be pushed toward 7 TeV. In this range of energy, the main magnets will enter a new regime. For this reason, this paper will present a detailed study of the performance of the FiDeL model that could be critical for the operation in 2015. In particular this paper will study the saturation component and its precision in the model, together with the hysteresis error. The effect of these two components and their errors on the beta-beating is also given. Furthermore, an estimate of the dynamic effects visible in the tune and chromaticity will be presented for the 7 TeV operation.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-THPRO080  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
FRXCA01 State-of-the-art and Future Challenges for Machine Protection Systems 4060
 
  • J. Wenninger
    CERN, Geneva, Switzerland
 
  Current frontier accelerators explore regimes of increasing power and stored energy, with beam energies spanning more than three orders of magnitude from the GeV to the TeV scale. In many cases the high beam power has to cohabit with superconducting equipment in the form of magnets or RF cavities requiring careful control of losses and of halos to mitigate quenches. Despite their large diversity in physics goals and operation modes, all facilities depend on their “Machine Protection Systems” (MPS) for safe and efficient running. This presentation will aim to give an overview of current MPS and on how the MPS act on or control the beams. Lessons from the LHC and other accelerators show that ever tighter monitoring of accelerator equipment and of beam parameters is required in the future. Such new monitoring systems must not only be very accurate but also be extremely reliable to minimize false alarms. Novel MPS ideas and concepts for linear colliders, high intensity hadron accelerators and to other high power accelerators will be presented.  
slides icon Slides FRXCA01 [5.507 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-FRXCA01  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)