Author: Toral, F.
Paper Title Page
MOPRO027 Measurements and Laboratory Tests on a Prototype Stripline Kicker for the CLIC Damping Rings 125
 
  • C. Belver-Aguilar, A. Faus-Golfe
    IFIC, Valencia, Spain
  • M.J. Barnes, H.A. Day
    CERN, Geneva, Switzerland
  • F. Toral
    CIEMAT, Madrid, Spain
 
  The Pre-Damping Rings (PDRs) and Damping Rings (DRs) of CLIC are required to reduce the beam emittances to the small values required for the main linacs. The injection and extraction, from the PDRs and DRs, are performed by kicker systems. To achieve both low beam coupling impedance and reasonable broadband impedance matching to the electrical circuit, striplines have been chosen for the kicker elements. Prototype striplines have been built: tests and measurements of these striplines have started. The goal of these tests is to characterize, without beam, the electromagnetic response of the striplines. The tests have been carried out at CERN. To study the signal transmission through the striplines, the measured S-parameters have been compared with simulations. In addition, measurements of longitudinal beam coupling impedance, using the coaxial wire method, are reported and compared with simulations.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-MOPRO027  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPRO033 Design and Feasibility Study of a Transverse Halo Collimation System for ATF2 145
 
  • N. Fuster-Martínez
    Valencia University, Atomic Molecular and Nuclear Physics Department, Valencia, Spain
  • P. Bambade, S. Liu, S. Wallon
    LAL, Orsay, France
  • A. Faus-Golfe, J. Resta-López
    IFIC, Valencia, Spain
  • K. Kubo, T. Okugi, T. Tauchi, N. Terunuma
    KEK, Ibaraki, Japan
  • I. Podadera, F. Toral
    CIEMAT, Madrid, Spain
 
  Funding: Work supported by FPA2010-21456-C02-01 and by i-link 0704
This paper presents the design of a halo collimation system for the ATF2 beamline. The main objective is the reduction of background noise that limits the performance of key diagnostic devices around the final focal point (IP), especially the Shintake Monitor (IPBSM) used for measuring the nanometer level vertical beam sizes and the future Diamond Sensor (DS) for measuring the beam halo. Beam tracking simulations have been performed to optimize the position and characteristics of the halo collimation devices. Furthermore the collimator wakefield-induced effect is being studied.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-MOPRO033  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRI050 Calculation and Design of the Re-buncher Cavities for the LIPAc Deuteron Accelerator 3881
 
  • D. Gavela, I. Podadera, F. Toral
    CIEMAT, Madrid, Spain
 
  Funding: This work has been partially funded by the Spanish Ministry of Economy and Competitiveness under project AIC-A-2011-0654
Two re-buncher cavities are necessary for the LIPAc (Linear IFMIF Prototype Accelerator), presently being built at Rokkasho (Japan). They are placed at the Medium Energy Beam Transport (MEBT) line to longitudinally focus a 5 MeV CW deuteron beam. Due to the strong space charge and the compactness of the beamline, the cavity has several space restrictions. In order to minimize the power loss, an IH-type cavity with 5 gaps was selected. It provides an effective voltage of 350 kV at 175 MHz with a power loss of 6.6 kW. First, electromagnetic calculations have been done with HFSS to compute the resonant frequency, the S-parameters, the electric and magnetic field maps, the power losses and the proper geometry for a magnetic input coupler and a pickup probe. Then, a mechanical Ansys model has been used to analyze the stresses and deformations due to vacuum, the cooling circuit and the temperature distribution, taking into account the power losses imported from the electromagnetic model. Finally, the fluid dynamics in the cooling circuits of the stems has been carefully studied.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-THPRI050  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRI051 Fabrication and Tests of the Re-buncher Cavities for the LIPAc Deuteron Accelerator 3884
 
  • D. Gavela, P. Abramian, J. Calero, A. Guirao, J.L. Gutiérrez, E. Molina Marinas, I. Podadera, L. Sánchez, F. Toral
    CIEMAT, Madrid, Spain
 
  Funding: This work has been partially funded by the Spanish Ministry of Economy and Competitiveness under project AIC-A-2011-0654
Two re-buncher cavities will be installed at the Medium Energy Beam Transport (MEBT) of the LIPAc accelerator, presently being built at Rokkasho (Japan). They are IH-type cavities with 5 gaps and will provide an effective voltage of 350 kV at 175 MHz. The cavity consists of a cylindrical main body and two endplates in stainless steel with an internal copper coating. The stems and drift tubes are machined from bulk OFE copper. The fabrication techniques for the cooling pipes, the input coupler and the pick-up are presented. Material choices and fabrication process are discussed. The first re-buncher is already fabricated. RF low power tests have been made to measure resonant frequency, S-parameters and Q-factor before and after the copper plating. The electric field map has also been measured with the bead-pull method.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-THPRI051  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRI052 Design, Fabrication and Tests of the Second Prototype of the Double-Length CLIC PETS 3887
 
  • L. Sánchez, J. Calero, D. Gavela, J.L. Gutiérrez, F. Toral
    CIEMAT, Madrid, Spain
  • D. Gudkov, G. Riddone
    CERN, Geneva, Switzerland
 
  Funding: This work has been partially funded by the Spanish Ministry of Economy and Competitiveness under project FPA2010-21456-C02-02
The future collider CLIC is based on a two-beam acceleration scheme, where the drive beam provides to the main beam the RF power through the Power Extraction and Transfer Structures (PETS). The technical feasibility of some components is currently being proved at the CLIC Experimental Area (CLEX). Two double- length CLIC PETS will be installed in CLEX to validate their performance with beam. The first prototype was produced and validated in 2012. This paper is focused on the engineering design, fabrication and validation of the second prototype. Taking into account the results of the first prototype, some modifications have been included in the design to ease fabrication and assembly. The fabrication techniques are very similar to the ones used for the first prototype. Mechanical measurements on single parts and different assembly stages will be reported. The industrialization feasibility will be also analyzed. Finally, several tests such as vacuum tightness and RF measurements with low power have been realized to validate the device. These results are compared with the first prototype ones.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-THPRI052  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)