MOPRO001 Upgrade Status of Injector LINAC for SuperKEKB 59
 
  • T. Miura, M. Akemoto, D.A. Arakawa, Y. Arakida, A. Enomoto, S. Fukuda, Y. Funakoshi, K. Furukawa, T. Higo, H. Honma, R. Ichimiya, N. Iida, M. Ikeda, E. Kadokura, H. Kaji, K. Kakihara, T. Kamitani, H. Katagiri, M. Kurashina, S. Matsumoto, T. Matsumoto, H. Matsushita, S. Michizono, K. Mikawa, F. Miyahara, H. Nakajima, K. Nakao, T. Natsui, Y. Ogawa, Y. Ohnishi, S. Ohsawa, F. Qiu, M. Satoh, T. Shidara, A. Shirakawa, H. Sugimoto, T. Suwada, T. Takenaka, M. Tanaka, Y. Yano, K. Yokoyama, M. Yoshida, L. Zang, X. Zhou
    KEK, Ibaraki, Japan
  • D. Satoh
    TIT, Tokyo, Japan
 
  The SuperKEKB collider is under construction to achieve 40-times higher luminosity than that of previous KEKB collider. The injector LINAC should provide high-intensity and low-emittance beams of 7-GeV electron and 4-GeV positron for SuperKEKB based on a nano-beam scheme. A photocathode RF-gun for low emittance electron beam has been already installed and the commissioning has started. The construction of positron capture section using a flux-concentrator and the dumping ring for low emittance positron beam is in progress. The simultaneous top-up injections to four storage-rings including photon factories is also required. In the upstream of dumping ring, the compatible optics between positron and electron has been designed. In the downstream of dumping ring, RF phase, focusing, and steering magnets will be switched by pulse to pulse against each beam-mode for optimising beam-transportation. This paper describes recent upgrade status toward the SuperKEKB.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-MOPRO001  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPRO110 Present Status of the Compact ERL at KEK 353
 
  • N. Nakamura, M. Adachi, S. Adachi, M. Akemoto, D.A. Arakawa, S. Asaoka, K. Enami, K. Endo, S. Fukuda, T. Furuya, K. Haga, K. Hara, K. Harada, T. Honda, Y. Honda, H. Honma, T. Honma, K. Hosoyama, K. Hozumi, A. Ishii, E. Kako, Y. Kamiya, H. Katagiri, H. Kawata, Y. Kobayashi, Y. Kojima, Y. Kondou, T. Kume, T. Matsumoto, H. Matsumura, H. Matsushita, S. Michizono, T. Miura, T. Miyajima, H. Miyauchi, S. Nagahashi, H. Nakai, H. Nakajima, K. Nakanishi, K. Nakao, K.N. Nigorikawa, T. Nogami, S. Noguchi, S. Nozawa, T. Obina, T. Ozaki, F. Qiu, H. Sagehashi, H. Sakai, S. Sakanaka, S. Sasaki, K. Satoh, M. Satoh, T. Shidara, M. Shimada, K. Shinoe, T. Shioya, T. Shishido, M. Tadano, T. Tahara, T. Takahashi, R. Takai, H. Takaki, T. Takenaka, O. Tanaka, Y. Tanimoto, M. Tobiyama, K. Tsuchiya, T. Uchiyama, A. Ueda, K. Umemori, K. Watanabe, M. Yamamoto, Y. Yamamoto, Y. Yano, M. Yoshida
    KEK, Ibaraki, Japan
  • E. Cenni
    Sokendai, Ibaraki, Japan
  • R. Hajima, S. Matsuba, R. Nagai, N. Nishimori, M. Sawamura, T. Shizuma
    JAEA, Ibaraki-ken, Japan
  • J.G. Hwang
    KNU, Deagu, Republic of Korea
  • M. Kuriki
    Hiroshima University, Graduate School of Science, Higashi-Hiroshima, Japan
  • Y. Seimiya
    HU/AdSM, Higashi-Hiroshima, Japan
 
  The Compact Energy Recovery Linac (cERL) project is ongoing at KEK in order to demonstrate excellent ERL performance as a future light source. The cERL injector was already constructed with its diagnostic beamline and successfully commissioned from April to June in 2013. In the next step, the cERL recirculation loop with a main superconducting linac and merger and dump sections has been constructed and its commissioning is scheduled to start in December 2013. Significant progress is expected by the IPAC14 conference date. In this presentation, we will describe the present status of the cERL including future developments.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-MOPRO110  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPRI004 SuperKEKB Positron Source Construction Status 579
 
  • T. Kamitani, M. Akemoto, D.A. Arakawa, Y. Arakida, A. Enomoto, S. Fukuda, Y. Funakoshi, K. Furukawa, T. Higo, H. Honma, N. Iida, M. Ikeda, E. Kadokura, H. Kaji, K. Kakihara, H. Katagiri, M. Kikuchi, H. Koiso, M. Kurashina, S. Matsumoto, T. Matsumoto, H. Matsushita, S. Michizono, K. Mikawa, T. Mimashi, T. Miura, F. Miyahara, T. Mori, A. Morita, H. Nakajima, K. Nakao, T. Natsui, Y. Ogawa, Y. Ohnishi, S. Ohsawa, M. Sato, T. Shidara, A. Shirakawa, M. Suetake, H. Sugimoto, T. Suwada, T. Takatomi, T. Takenaka, M. Tanaka, M. Tawada, Y. Yano, K. Yokoyama, M. Yoshida, L. Zang, X. Zhou
    KEK, Ibaraki, Japan
  • D. Satoh
    TIT, Tokyo, Japan
 
  The KEKB positron source is under the upgrade for SuperKEKB. The previous positron production target and capture section have been removed and the new system is constructed at a location forty meters upstream to have sufficient energy margin for beam injection to the newly introduced damping ring. A flux concentrator is introduced in the new capture section to make an adiabatic matching system. Large aperture (30mm in diameter) S-band accelerating structures are introduced in the capture section and in the subsequent accelerator module to enlarge the transverse phase space acceptance. The beam focusing system of quadrupoles is also upgraded for a comparable beam acceptance to that of the capture section. This paper reports on the status of the SuperKEKB positron source construction and the preliminary positron beam commissioning.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-MOPRI004  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPME073 Performance of RF System for Compact-ERL Main Linac at KEK 2450
 
  • T. Miura, M. Akemoto, A. Akiyama, D.A. Arakawa, S. Fukuda, H. Honma, H. Katagiri, T. Matsumoto, H. Matsushita, S. Michizono, H. Nakajima, K. Nakao, F. Qiu, H. Sakai, T. Shidara, T. Takenaka, K. Umemori, Y. Yano
    KEK, Ibaraki, Japan
 
  The construction of compact ERL in the first stage has been completed in the end of 2013. The rf commissioning in main-linac has been started. The main-linac consists of two nine-cell cavities. The loaded Q is high, ~107. As the rf power sources, a solid state power amplifier and an inductive output tube (IOT) has been used for two cavities, respectively. The RF field and tuner have been successfully controlled by using micro-TCA digital feedback board. This paper reports about the RF commissioning and the performance.  