Author: Yoshimoto, M.
Paper Title Page
MOPME028 A Preliminary Study of the Vibration Wire Monitor for Beam Halo Diagnostic in J-PARC L3BT 535
 
  • K. Okabe, M. Kinsho, K. Yamamoto, M. Yoshimoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
 
  In the J-PARC 3-GeV Rapid Cycle Synchrotron (RCS), transverse beam halo diagnostic and scraping are required to increase the output beam power. Wire scanners and halo scrapers were used for measurement of projected beam distributions to determine the extent of beam halo formation at Linac-3GeV Beam Transport line (L3BT). In order to determine more detail of halo formation, Vibration Wire Monitor (VWM) was installed in L3BT for the beam halo measurement and the offline study at the test stand with low energy electron gun are started. The high sensitivity of the VWM makes it a prospective one for investigation of beam halo and weak beam scanning. In this paper, we will report a preliminary results of offline studies and beam halo measurement by VWM at L3BT.  
 
THPWO032 Progress of Injection Energy Upgrade Project for J-PARC RCS 3833
 
  • N. Hayashi, H. Harada, K. Horino, H. Hotchi, J. Kamiya, M. Kinsho, P.K. Saha, Y. Shobuda, T. Takayanagi, N. Tani, T. Togashi, T. Ueno, M. Watanabe, Y. Watanabe, K. Yamamoto, M. Yamamoto, Y. Yamazaki, M. Yoshimoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
  • Y. Irie
    KEK, Ibaraki, Japan
  • T. Toyama
    J-PARC, KEK & JAEA, Ibaraki-ken, Japan
 
  The injection energy of the J-PARC RCS will be upgraded in 2013. New power supplies for the shift bump magnet system will be installed. Some of other systems, upgrade of the painting bump power supplies and pulse steering systems, are already installed and tested or used for the nominal operation. The paper reports the progress of injection energy upgrade project.  
 
THPWO033 High Intensity Beam Trial of up to 540 kW in J-PARC RCS 3836
 
  • H. Hotchi, H. Harada, N. Hayashi, M. Kinsho, P.K. Saha, Y. Shobuda, F. Tamura, K. Yamamoto, M. Yamamoto, M. Yoshimoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
  • Y. Irie
    KEK, Ibaraki, Japan
  • S. Kato
    Tohoku University, Graduate School of Science, Sendai, Japan
 
  Recently we have performed a high intensity beam trial of up to 540 kW. In this paper, beam intensity dependece and injection painting parameter dependence of beam loss, observed in this beam experiment, will be discussed with the corresponding numerical simulation results.