|
Construction of the Central Japan Synchrotron Radiation (SR) Facility has been completed in the Aichi area of Japan, and the beam commissioning was started in Spring of 2012. Up to now, it is confirmed that the 1.2 GeV storage ring works with 300 mA Top-up mode. The key equipments of the accelerators are a compact electron storage ring with the ability to supply hard X-rays and full energy injectors for the top-up operation. The accelerators consist of an electron storage ring, a booster synchrotron ring, and an injector linac. In this prezentation, the present status of the accelerators are reported.
|
|