Paper |
Title |
Page |
TUODB101 |
Studies on An S-band Bunching System with Hybrid Buncher |
1120 |
|
- S. Pei, O. Xiao
IHEP, Beijing, People's Republic of China
|
|
|
Generally, a standard bunching system is composed by a SW pre-buncher, a TW buncher and a standard accelerating section. However, there is one way to simplify the whole system to some extent by using the hybrid buncher, which is a combined structure of the SW pre-buncher and the TW buncher. Here the beam dynamics studies on an S-band bunching system with hybrid buncher is presented, simulation results shows that similar beam performance can be obtained at the linac exit by using this kind of bunching system rather than the standard one. In the meantime, the structure design of the hybrid buncher is also described. Furthermore, the standard accelerating section can also be integrated with the hybrid buncher, this can further simplify the bunching system and lower the construction cost.
|
|
|
Slides TUODB101 [22.120 MB]
|
|
|
TUPWA014 |
The Status of Coupling Impedance Measurement for the CSNS/RCS Extraction Kicker Prototype* |
1754 |
|
- L. Huang, Y. Li, R.H. Liu, Y.D. Liu, S. Wang, O. Xiao
IHEP, Beijing, People's Republic of China
|
|
|
Rapid Cycling Synchrotron (RCS) of the China Spallation Neutron Source (CSNS) is a high intensity proton accelerator, with average beam power of 100kW. In order to high intensity beam operation, the beam coupling impedance of the extracted kickers must be controlled. Longitudinal and transverse impedance of extracted kicker prototype with power supply had been roughly measured by coaxial-wire and dual-wire methods respectively. At the same time, impedance of window has been analyzed theoretically and simulated based on CST PARTICLE STUDIO.
|
|
|