Author: Watanabe, M.
Paper Title Page
MOPWA007 Operating Experience of Kicker Magnet System in the J-PARC 3GeV RCS 678
 
  • K. Suganuma, M. Kinsho, T. Togashi, M. Watanabe
    JAEA/J-PARC, Tokai-mura, Japan
 
  The J-PARC 3-GeV rapid cycling synchrotron (RCS) has been provided proton beam to the Material and Life Science Facility (MLF)as well as to the 50 GeV Main Ring (MR). Proton beam is accelerated from 181 MeV to 3GeV in the RCS and immediately extracted it to the beam transport line to the MLF and the MR. Extraction kicker system is used for this fast extraction. The RCS has been operated for the neutron and MLF users program from December 23rd, 2008. At the beginning of user operation there were many troubles for the extraction kicker system, especially, thyratron which are used for switch of power supply often caused failure. The beam stop rate due to RCS extraction kicker system was more than 13% in the total beam stop of the J-PARC, establishment and operation experience of the tuning for power supply of the extraction kicker make the beam stop rate less than 0.5% in November 2012. In this paper, we are going to report about daily operation whose main is about operation of thyratron and the maintenance held in summer 2012. And  We also going to report about the aptitude test of thyratron as a plan of the future.  
 
THPWO032 Progress of Injection Energy Upgrade Project for J-PARC RCS 3833
 
  • N. Hayashi, H. Harada, K. Horino, H. Hotchi, J. Kamiya, M. Kinsho, P.K. Saha, Y. Shobuda, T. Takayanagi, N. Tani, T. Togashi, T. Ueno, M. Watanabe, Y. Watanabe, K. Yamamoto, M. Yamamoto, Y. Yamazaki, M. Yoshimoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
  • Y. Irie
    KEK, Ibaraki, Japan
  • T. Toyama
    J-PARC, KEK & JAEA, Ibaraki-ken, Japan
 
  The injection energy of the J-PARC RCS will be upgraded in 2013. New power supplies for the shift bump magnet system will be installed. Some of other systems, upgrade of the painting bump power supplies and pulse steering systems, are already installed and tested or used for the nominal operation. The paper reports the progress of injection energy upgrade project.