Author: Wang, C.H.
Paper Title Page
THPEA010 Design and Implementation of the Remote Control System of the Digital Magnet Power Supply of China Spallation Neutron Source 3167
 
  • X. Wu, Y.C. He, J. Liu, C.H. Wang, J.C. Wang
    IHEP, Beijing, People's Republic of China
 
  The magnet power supplies of the China Spallation Neutron Source (CSNS) can be classified into three types: rapid cycling synchrotron (RCS) resonant power supplies, fast response power supplies and DC power supplies. All of the magnet power supplies are controlled by the intelligent controller called Digital Power Supply Control Module (DPSCM), which can regulate the current and voltage circuit. The DPSCM is developed by the power supply group. It has two RS232 communication interfaces. All the command setting and reading power parameters are transmitted by Modbus protocol. Therefore, we made the communication protocol based on Modbus RTU between the remote control system and the DPSCM. This paper introduces the design of the remote control interface to the DPSCM. We developed EPICS IOC applications and real-time database on MOXA embedded serial device DA710 and OPIs using Control System Studio (CSS) according to different kinds of the power supplies. We have tested the remote control system with these kinds of power supplies. The test result shows that the remote control system is stable and reliable and it can basically meet the requirements of power supply system and physicists.  
 
FRXAB201 Status of CSNS Project 3995
 
  • S. Fu, H. Chen, Y.W. Chen, H. Dong, S.X. Fang, K.X. Huang, W. Kang, J. Li, H.C. Liu, L. Ma, H.F. Ouyang, H. Qu, H. Sun, J.Y. Tang, C.H. Wang, Q.B. Wang, S. Wang, T.G. Xu, Z.X. Xu, C. Zhang, J. Zhang
    IHEP, Beijing, People's Republic of China
 
  The China Spallation Neutron Source (CSNS) accelerator is designed to accelerate proton beam pulses to 1.6 GeV at 25 Hz repetition rate, striking a solid metal target to produce spallation neutrons. The accelerator provides a beam power of 100 kW on the target in the first phase and then 500 kW in the second phase by increasing the average beam intensity 5 times while raising the linac output energy. The project construction has been formally launched in 2011 and it is planed to complete the project in March 2018. It is one of the high intensity proton accelerator projects in the world and it imposes a great challenge to Chinese accelerator community. This presentation will cover the status and challenges of the CSNS project.  
slides icon Slides FRXAB201 [4.320 MB]