THPWO091 | Staging Scenarios for Project-X | 3972 |
|
||
Funding: US DOE under contract DE-AC02-76CH03000. Project-X is a high intensity proton source in development at Fermilab. At its heart is a linac based on superconducting technology comprising two distinct sections. The first one operates in CW mode and delivers beam with a flexible time structure to simultaneous experimental programs at 1 and 3 GeV. The second one operates in pulsed mode and accelerates a modest fraction (5%) of the beam from 3 GeV to 8 GeV for accumulation in the existing Main Injector complex. In an era of constrained budgets, construction in stages -with each stage capable of supporting worthy scientific programs - may be advantageous. Requirements for each program, coupled to the physical constraints imposed by the Fermilab site have led to a few possible scenarios, which are discussed in this contribution. In particular, we examine the implications of introducing bends in the linac at 1 and 3 GeV in terms of overall performance, flexibility and cost. |
||