Author: Tranquille, G.
Paper Title Page
MOPWA036 GEM Detectors for the Transverse Profile Measurement of Low Energy Antiprotons and High Energy Hadrons 747
 
  • J. Spanggaard, P. Carriere, S.C. Duarte Pinto, G. Tranquille
    CERN, Geneva, Switzerland
 
  Gas Electron Multipliers (GEM) are finding more and more applications in beam instrumentation. Gas Electron Multiplication is a very similar physical phenomenon to that which occurs in Multi Wire Proportional Chambers (MWPC), but for small profile monitors GEMs are much more cost effective to produce and maintain. In 2012, all Multi-Wire Proportional Chambers in the experimental areas of the Antiproton Decelerator at CERN were successfully replaced by Gas Electron Multipliers. This paper describes the choice of detector and reports on the commissioning of 20 GEM detectors for transverse profile measurement on low energy antiproton beams (5.3 MeV, equal to 100 MeV/c). It will also cover the development of, and first results from, a new 200x200 mm GEM detector for profiling the high energy muon beam (172 GeV/c) delivered to the COMPASS experiment and discuss the outlook for replacing all Multi-Wire Proportional Chambers in the CERN experimental areas by GEM based monitors.  
 
WEPEA060 Plans for the Upgrade of CERN's Heavy Ion Complex 2645
 
  • D. Manglunki, M. E. Angoletta, H. Bartosik, A. Blas, D. Bodart, M.A. Bodendorfer, T. Bohl, J. Borburgh, E. Carlier, J.-M. Cravero, H. Damerau, L. Ducimetière, A. Findlay, R. Garoby, S.S. Gilardoni, B. Goddard, S. Hancock, E.B. Holzer, J.M. Jowett, T. Kramer, D. Kuchler, A.M. Lombardi, Y. Papaphilippou, S. Pasinelli, R. Scrivens, G. Tranquille
    CERN, Geneva, Switzerland
 
  To reach a luminosity higher than 6×1027 Hz/cm2 for Pb-Pb collisions, as expected by the ALICE experiment after its upgrade during the 2nd Long LHC Shutdown (LS2), several upgrades will have to be performed in the CERN accelerator complex, from the source to the LHC itself. This paper first details the present limitations and then describes the strategy for the different machines in the ion injector chain. Both filling schemes and possible hardware upgrades are discussed.  
 
WEPEA061 The First LHC p-Pb run: Performance of the Heavy Ion Production Complex 2648
 
  • D. Manglunki, M. E. Angoletta, H. Bartosik, G. Bellodi, A. Blas, M.A. Bodendorfer, T. Bohl, C. Carli, E. Carlier, S. Cettour Cave, K. Cornelis, H. Damerau, A. Findlay, S.S. Gilardoni, S. Hancock, J.M. Jowett, D. Kuchler, M. O'Neil, Y. Papaphilippou, S. Pasinelli, R. Scrivens, G. Tranquille, B. Vandorpe, U. Wehrle, J. Wenninger
    CERN, Geneva, Switzerland
 
  TThe first LHC proton-ion run took place in January-February 2013; it was the first extension to the collider programme, as this mode was not included in the design report. This paper presents the performance of the heavy ion and proton production complex, and details the issues encountered, in particular the creation of the same bunch pattern in both beams.  
 
WEPEA062 Progress in ELENA Design 2651
 
  • S. Maury, W. Bartmann, P. Belochitskii, H. Breuker, F. Butin, C. Carli, T. Eriksson, R. Kersevan, S. Pasinelli, G. Tranquille, G. Vanbavinckhove
    CERN, Geneva, Switzerland
  • W. Oelert
    FZJ, Jülich, Germany
 
  The Extra Low Energy Antiproton ring (ELENA) is a small ring at CERN which will be built to increase substantially the number of usable (or trappable) antiprotons delivered to experiments for studies with antihydrogen. The report shows the progress in the ELENA design. The choice of optics and ring layout inside of AD hall is given. The main limitations for beam parameters at extraction like intra beam scattering and tune shift due to space charge are discussed. The electron cooler plays key role in ELENA both for efficient deceleration as well as for preparing extracted beam with parameters defined by experiments. The other important systems like beam vacuum, beam instrumentations and others are reviewed as well.  
 
WEPEA063 Upgrades and Consolidation of the CERN AD for Operation during the Next Decades 2654
 
  • T. Eriksson, M. E. Angoletta, L. Arnaudon, J.A. Baillie, M. Calviani, F. Caspers, L.V. Joergensen, R. Kersevan, G. Le Godec, R. Louwerse, M. Ludwig, S. Maury, A. Newborough, C. Oliveira, G. Tranquille
    CERN, Geneva, Switzerland
 
  As the ELENA project is now well underway, focus is turned to the Antiproton Decelerator (AD) itself. Most of the machine’s key components are in operation since more than 25 years and a substantial consolidation program is now being launched in view of continued operation beyond 2025. Over the course of the next few years a progressive consolidation of the AD-Target area, the AD-ring and all associated systems will take place. Several investigations have recently been performed in the target area with the objective of establishing the radiation environment and the sensitivity of the antiproton production to potential misalignment of the production elements. Identification of reliability and serviceability issues of the AD-ring components and associated systems has been done and will continue during the 2013 shut-down. Planned and ongoing consolidation activities are also discussed with emphasis on stochastic and electron beam cooling, instrumentation, RF systems, vacuum, magnets, power converters and beam transfer equipment.